ADR-010
Setting up your dashboard 0 entities found · 7/32 branches scanned
ID:ADR-010Status:proposed

Unified root-level refrakt config

Source:SPEC-043

Context

Refrakt's CLI surface is growing in three directions that all want answers from a single source of truth, and we don't have one yet.

Plugin discovery. SPEC-043 introduces an MCP server that needs to enumerate installed plugins at startup. The current CLI does this lazily — runPlugin(namespace, args) in packages/cli/src/bin.ts only attempts to import @refrakt-md/<namespace>/cli-plugin when the user types that namespace. There is no existing list. The natural fallback is scanning package.json for @refrakt-md/* dependencies, but that is heuristic: it can't tell a real plugin from a transitive dep, can't distinguish runes-only packages from CLI-extending ones, and forces every consumer (CLI dispatch, --help, MCP) to repeat the same scan.

Path scattering. Plan paths (--dir, --specs, --out, --css), site paths (contentDir), and theme paths are spread across CLI flags and ad-hoc defaults. A plan-only repo with files in project/plan/ instead of the default plan/ has to pass --dir project/plan to every command. There is no place to record "in this repo, plan lives here."

Two lifecycles, one repo. The current site/refrakt.config.json is site-shaped — contentDir, theme, target, packages, routeRules, icons. It assumes every refrakt user is building a SvelteKit site. Planning-only repos use @refrakt-md/plan with zero config, autodetecting plan/. Repos that want both end up with a site config plus implicit plan conventions, neither aware of the other.

The MCP spec's auto-detection + discoverPlugins() proposal mitigates these in the short term but doesn't resolve them — autodetection is heuristic, and the helper still has to scan dependencies because there is no declared list.

Options Considered

1. Status quo — autodetection plus package.json scanning

Keep refrakt.config.json as a site-only file. MCP and discoverPlugins() scan package.json for @refrakt-md/* deps and attempt to load each one's cli-plugin.

Pros:

  • Zero migration cost.
  • Planning-only users stay zero-config.
  • Already specified in SPEC-043.

Cons:

  • Plugin list is heuristic — transitive deps and non-CLI packages can show up; opting out requires per-package metadata.
  • Path overrides stay scattered across CLI flags forever.
  • No single answer to "what is this refrakt project?" for tooling.
  • The MCP server's "did you mean?" suggestions are only as good as the heuristic.

2. New root config alongside the site config

Add a fresh root file (refrakt.json or similar) that holds plugins/plan/site references. Leave site/refrakt.config.json alone.

Pros:

  • Site config semantics are untouched.
  • Clean separation between "project config" and "site config."

Cons:

  • Two config files where there could be one. Authors have to learn which knob lives where.
  • The existing packages field in the site config is conceptually a plugin reference too — duplicating it across files is worse than unifying.
  • Naming collision risk (refrakt.json vs refrakt.config.json is a foot-gun).

3. Expand refrakt.config.json into a unified root config — chosen

Promote refrakt.config.json to be the project-level config, with explicit plugins, plan, and site sections. Keep the file optional so autodetection remains the fallback for zero-config repos. The current flat shape (contentDir, theme, target, packages, …) continues to work but is treated as shorthand for the site.* namespace.

Proposed shape (single site, common case):

{
  "plugins": [
    "@refrakt-md/plan",
    "@refrakt-md/marketing",
    "@refrakt-md/docs"
  ],
  "plan": {
    "dir": "plan"
  },
  "site": {
    "contentDir": "./content",
    "theme": "@refrakt-md/lumina",
    "target": "svelte",
    "packages": ["@refrakt-md/marketing", "@refrakt-md/docs"],
    "routeRules": [/* … */],
    "icons": {/* … */}
  }
}

Proposed shape (multiple sites in one repo):

{
  "plugins": ["@refrakt-md/plan", "@refrakt-md/marketing"],
  "plan": { "dir": "plan" },
  "sites": {
    "main": {
      "contentDir": "./site/content",
      "theme": "@refrakt-md/lumina",
      "target": "svelte",
      "packages": ["@refrakt-md/marketing"]
    },
    "blog": {
      "contentDir": "./blog/content",
      "theme": "@refrakt-md/lumina",
      "target": "svelte",
      "packages": ["@refrakt-md/marketing"]
    }
  }
}

site (singular) and sites (plural map) are mutually exclusive. The loader normalizes both into a single internal sites: Record<string, SiteConfig> shape — site becomes sites.default. Downstream consumers (SvelteKit plugin, MCP server, CLI commands) only ever see the normalized form.

Resolution rules:

  • File absent → autodetect everything (current behavior preserved for planning-only repos).
  • File present, only plan section → behaves like a planning-only project; site tools are unavailable.
  • File present, only site (or flat shorthand) → single-site project; normalizes to sites.default.
  • File present, only sites → multi-site project; CLI and SvelteKit plugin require a site identifier (or pick the only entry when there is exactly one).
  • File present, both site and sites → configuration error; loader rejects with a clear message.
  • File present, plan + site(s) → both contexts active; MCP exposes both tool groups.
  • plugins is the canonical plugin list. If absent, fall back to scanning dependencies as today. If present, it is authoritative — the scanner does not look at package.json.
  • site(s).*.packages and the top-level plugins array overlap intentionally: packages per site controls which rune packages are merged into that site's ThemeConfig (a SvelteKit-plugin concern); plugins controls which packages contribute CLI commands and MCP tools. Most users will list a package in both, but the split lets a CLI-only plugin (no runes) skip site merging, and lets two sites in the same repo merge different package subsets.

Pros:

  • One file, one mental model. "Where do I tell refrakt about my plan?" has one answer.
  • Plugin discovery becomes "read the array" for projects that opt in, eliminating heuristic ambiguity.
  • Path overrides have a home — no more --dir on every plan invocation.
  • Multi-site monorepos (docs + marketing, project + plan dashboard, multi-tenant) get a first-class story instead of needing separate repos or out-of-band orchestration.
  • Backwards compatible via the flat-shape shorthand; no forced migration for existing sites.
  • Sets up future sections (docs, editor, etc.) without further format churn.

Cons:

  • Slight config tax for repos that want explicit control (mitigated: file is optional).
  • Three ways to write site config (flat / site singular / sites plural) during the transition window — all collapse to the same normalized shape internally.
  • The dual plugins / site(s).packages distinction needs documentation.
  • Multi-site repos require a --site <name> flag on site-targeted CLI commands and a way for the SvelteKit plugin to be told which site it is building.

4. Autodetection-only, no config at all

Remove refrakt.config.json and infer everything from package.json and directory structure.

Pros:

  • Maximum zero-config charm.

Cons:

  • Site config is genuinely too rich to autodetect (routeRules, icons, backgrounds).
  • No place for explicit overrides.
  • Doesn't solve plugin discovery — same heuristic problem.

Decision

Adopt option 3. refrakt.config.json becomes the unified root config with optional plugins, plan, and site/sites sections. The file remains optional. The current flat site shape and the new singular site form are both valid shorthands for sites.default; multi-site repos use the sites map. Existing projects keep working without changes.

Consequences

For SPEC-043 (MCP server):

  • discoverPlugins() reads config.plugins first and only falls back to dependency scanning when the field is absent.
  • Autodetection still applies when no config exists, but consults the config when one is present (e.g., plan.dir overrides the default plan/ lookup; declared sites confirm site context without sniffing the file system).
  • refrakt://detect reports detected context, config source (config-file vs autodetect), and the list of sites (with names) so the agent knows whether the project is single- or multi-site.
  • Site-scoped MCP tools (refrakt.inspect, refrakt.contracts, refrakt.validate) accept an optional site input. When the project has exactly one site, the field is optional; when there are multiple, it is required and the tool's input schema reflects that.

For the CLI:

  • loadRefraktConfigFile() in packages/cli/src/config-file.ts gains a normalization layer that accepts the flat, singular-site, and plural-sites shapes and returns a normalized RefraktConfig with plugins, plan, and sites: Record<string, SiteConfig> always populated.
  • RefraktConfig in packages/types grows the plugins, plan, site, and sites fields. The flat fields and singular site stay on the type for backwards compatibility but are marked deprecated in JSDoc as shorthand for sites.default.
  • Site-targeted commands (inspect, contracts, validate, etc.) gain a --site <name> flag. When the project has exactly one site, the flag is optional and the lone site is selected automatically; when multiple sites are declared and no flag is passed, the command errors with the available names.
  • refrakt plugins list (proposed in SPEC-043) shows the resolution source per plugin — from refrakt.config.json vs discovered in package.json.

For the SvelteKit plugin:

  • The plugin accepts a site option naming which entry from the config to build. When omitted, it errors at config-load time for multi-site repos and selects the lone site for single-site repos.
  • A monorepo wiring two SvelteKit apps to the same refrakt.config.json passes a different site name in each app's vite.config.ts. Content roots, themes, and package merges resolve from the chosen site's section.

For users:

  • Existing site users: zero changes required. Their flat config keeps working.
  • Existing planning-only users: zero changes required. Autodetection still runs.
  • New users wanting both contexts in one repo: one file declares everything.
  • Users wanting explicit plugin control: list packages under plugins and the heuristic scan is bypassed.
  • Multi-site monorepos: declare each site under sites.<name> and pick the right one per app or per CLI invocation.

For migration:

  • A refrakt config migrate command (small follow-up work item, not part of this ADR) can rewrite a flat site config into the nested shape on demand, and convert a singular site into sites.default when adding a second site. Not required — the flat and singular shapes stay valid indefinitely.
  • The SvelteKit plugin's loadContent() reads from the normalized sites[name] entry so the runtime contract is unchanged for single-site users (they hit sites.default transparently).

Open follow-up:

  • A separate spec should formalize the config schema (TypeScript interface, JSON Schema for editor tooling, validation rules, multi-site selection semantics). This ADR records the decision; the spec records the shape in detail.
  • SPEC-043's "Plugin Discovery" section should be updated after this ADR is accepted to reference config.plugins as the primary source, with dependency scanning as fallback. The MCP tool input schemas for site-scoped tools should also be updated to include the site parameter for multi-site repos.