Work
Setting up your dashboard 0 entities found · 8/32 branches scanned

Work Items

189 of 189 items
Draft 44
WORK-159 main
Unified RefraktConfig types, loader, and JSON Schema
Promote refrakt.config.json from a site-only file into the unified root config defined in ADR-010. Add type-level support for plugins, plan, site, and sites, normalize the three valid input shapes (flat / singular site / plural sites) into a canonical internal form, and publish a JSON Schema so editors can autocomplete and validate the file.
high moderate
0/10 criteria
WORK-160 main
Add discoverPlugins() helper to @refrakt-md/cli
Replace the lazy runPlugin import-on-demand pattern in packages/cli/src/bin.ts with a first-class discoverPlugins() helper that returns the full set of installed plugins. The helper has four consumers in v0.11.0 — CLI dispatch, refrakt --help, refrakt plugins list, and the new MCP server — and centralizing the logic eliminates three different implementations of the same scan.
high moderate
0/10 criteria
WORK-161 main
Extend CliPluginCommand with inputSchema/outputSchema/mcpHandler
Add three optional fields to the CliPluginCommand interface so plugin commands can declare structured input/output schemas and an MCP-friendly handler that bypasses argv parsing. Existing plugins keep working unchanged — the fields are purely additive.
high simple
0/5 criteria
WORK-162 main
Refactor runPlugin dispatch to use discoverPlugins
Switch the CLI's plugin dispatch in packages/cli/src/bin.ts from blind import('@refrakt-md/<namespace>/cli-plugin') to a discoverPlugins() lookup. This produces a friendlier "did you mean?" error when a namespace is misspelled (since we know the full set of installed plugins) and centralizes plugin loading on the new helper.
high moderate
0/5 criteria
WORK-166 main
Framework adapters accept site option
Update all five framework adapter packages — @refrakt-md/sveltekit, @refrakt-md/astro, @refrakt-md/nuxt, @refrakt-md/next, @refrakt-md/eleventy — to accept a site?: string option. Each adapter resolves its target site via the shared normalizer from WORK-159, then reads contentDir, theme, target, packages, routeRules, icons, backgrounds from the resolved site entry instead of the top-level config. Single-site projects and the legacy flat shape continue to work without changes; multi-site repos pick a target per adapter.
high moderate
0/12 criteria
WORK-167 main
Add inputSchema + mcpHandler to plan commands
Wire the @refrakt-md/plan CLI commands with the new schema fields from WORK-161 so the MCP server exposes them as cleanly typed tools. Each command gets a JSON Schema for its inputs and an mcpHandler that bypasses argv parsing and accepts a structured object directly.
high moderate
0/7 criteria
WORK-168 main
Plan package consumes unified config (init scaffolds, serve/build read paths)
Wire @refrakt-md/plan to the unified refrakt.config.json. plan init scaffolds the config (creating it or extending an existing one with a plan section), and plan serve / plan build / other plan commands read plan.dir from the loaded config instead of relying solely on the --dir flag and defaults. The plan section currently exposes only dir; specs path remains derived from dir (a child folder), and surfacing it as a config field can come later if real-world projects demand it.
high moderate
0/8 criteria
WORK-169 main
Scaffold @refrakt-md/mcp package with stdio entry, auto-detect, and core tools
Create the @refrakt-md/mcp package: stdio MCP server entry point, auto-detection of plan and site contexts from the unified config and the filesystem, and the initial set of core CLI-mirroring tools (refrakt.inspect, refrakt.contracts, refrakt.validate, refrakt.reference, refrakt.package_validate).
high complex
0/9 criteria
WORK-170 main
MCP plugin tools (via discovery) and resources
Wire plugin-contributed tools (notably the @refrakt-md/plan commands) into the MCP server via discoverPlugins(), and implement the read-only resources (refrakt://detect, refrakt://reference, refrakt://contracts, refrakt://rune/<name>, refrakt://plan/*) so agents that prefer pull semantics have first-class URIs.
high moderate
0/8 criteria
WORK-263 main
Collection rune: query engine and built-in layouts
The collection rune core — a sentinel-emitting schema plus a postProcess resolver that queries the registry (filter/sort/group/limit) and renders the built-in layouts, with the pinned $item bound-variable contract and the per-layout body interpretation.
high complex
0/7 criteria
WORK-268 main
entityRoutes config-rules adapter
The built-in adapter (in @refrakt-md/content) that turns site.entityRoutes into contributed pages: selects entities by type + filter, substitutes placeholders, renders an inline render string or a render-template partial per entity with $item bound, and back-fills sourceUrl.
high complex
0/6 criteria
WORK-270 main
Plan entity embeddability (sourceFile + extract)
Make plan entities embeddable so {% expand $item.id /%} renders their bodies in entityRoutes detail pages. The plan register hook currently sets sourceUrl only; add sourceFile and an extract that returns the entity rune's transformed body. This is the prerequisite the SPEC-071 dogfood depends on.
high moderate
0/4 criteria
WORK-272 main
refrakt plan site dogfood
Wire refrakt's own plan/ as a sites.plan site and author its plan-site/ content, proving that entityRoutes + collection replace the bespoke plan serve. This is the milestone's proof-of-practice.
high complex
0/4 criteria
WORK-440 main
Proof skin — validate the skeleton is theme-agnostic
The milestone's exit gate. The skeleton/skin extraction's goal is "theme #2 is a token file + layout + skin, not a fork" — but theme #2 is deferred (SPEC-094), so the extraction would otherwise ship with no consumer to prove it worked. The harness inert-proof only shows Lumina didn't regress; it does not show the skeleton is actually skin-agnostic. A thin proof skin closes that gap.
high moderate
0/3 criteria
WORK-005 main
Build stat Rune
medium
WORK-006 main
Build math Rune
medium
WORK-007 main
Build concept Rune
medium
WORK-008 main
Build exercise Rune
medium
WORK-010 main
Build glossary Rune
medium
WORK-018 main
Build video Rune
medium
WORK-163 main
refrakt --help lists installed plugins + new refrakt plugins list command
Surface the installed plugin set in two places: the top-level refrakt --help output (so users discover available namespaces without reading docs) and a dedicated refrakt plugins list command (canonical machine-readable output for tooling, including MCP clients debugging their setup).
medium simple
0/6 criteria
WORK-164 main
Add --site flag to site-scoped CLI commands
Site-scoped commands (inspect, contracts, validate, scaffold-css, package validate) need to know which site they are operating on when the project declares multiple. Add a --site <name> flag that selects an entry from the normalized sites map; for single-site projects the flag is optional and resolves to the lone entry.
medium moderate
0/7 criteria
WORK-172 main
Migrate this repo's site config to the unified root config
Move site/refrakt.config.json to a unified refrakt.config.json at the repo root, declaring plugins, the plan section, and sites.main (or whatever name we settle on) for the existing site. Validates the design against our own project and gives us a multi-site-ready structure for any future additions (separate plan dashboard site, blog, etc.).
medium simple
0/9 criteria
WORK-173 main
Update create-refrakt scaffolds for the unified config shape
create-refrakt currently writes a flat-shape site/refrakt.config.json for site projects and (via plan init) no config at all for plan projects. Update both paths to produce the new unified root-shape config — site projects get a sites.main section, plan projects get a plan section, and any combined scaffolds (future) declare both.
medium moderate
0/8 criteria
WORK-174 main
Site docs — configuration section
Document the unified refrakt.config.json at site/content/docs/configuration/. Cover the three valid shapes (flat / singular site / plural sites), each section (plugins, plan, site/sites), the multi-site workflow, and the migration story for existing flat-shape configs.
medium moderate
0/5 criteria
WORK-175 main
Site docs — MCP + plugin authoring update + CLAUDE.md pointer
Document the new @refrakt-md/mcp server (registration, tool reference, resource reference) at site/content/docs/mcp/, update the existing plugin authoring docs to cover the new cli-plugin schema fields (inputSchema, outputSchema, mcpHandler), and add a brief pointer in the root CLAUDE.md so AI agents know the MCP server exists when registered.
medium moderate
0/5 criteria
WORK-264 main
Collection heading-delimited table columns
The rich-table path: a table collection's body uses the sections content model (heading = column separator + label, body = per-cell markdoc template with $item), with collection owning the <table>/<thead> and row alignment.
medium moderate
0/4 criteria
WORK-271 main
create-refrakt plan-site scaffold
Add a plan project type to create-refrakt that scaffolds a complete, runnable plan site: config (plugin + entityRoutes), a seed plan/, and a plan-site/ content dir (layout + dashboards), for a chosen adapter target.
medium moderate
0/5 criteria
WORK-355 main
Generate theme scheme stylesheet from tokens.ts (retire hand-authored dark.css + tint.css palette copies)
The Lumina dark/scheme palette is hand-authored in three places that must be kept in lockstep by hand:
medium moderate
0/6 criteria
WORK-441 main
Gallery loads the assembled theme config (not just base + plugins)
The static gallery (the visual-regression harness from WORK-409) transforms pages with merged.config — i.e. coreConfig plus the enabled plugins' configs — but never calls assembleThemeConfig. The site assembles core → plugins → theme so theme-level overrides reach the engine; the gallery does not, so it can only ever render base output.This is a latent gap in the regression net: any override a theme applies via mergeThemeConfig (tints, icon swaps, and — after WORK-425 — per-rune defaultElevation/defaultProminence deltas) is invisible in the gallery. The gallery shows what a plugin ships, not what a theme actually renders.Not a blocker for WORK-425. Under the agreed Option A, base surface defaults live in core + plugin configs, which the gallery already loads, so default data-elevation/data-prominence emission is gallery-verifiable today. This item only matters once a theme overrides those defaults (Lumina currently inherits the base defaults unchanged).
medium simple
0/4 criteria
WORK-009 main
Build quiz Rune
low
WORK-011 main
Build prerequisite Rune
low
WORK-012 main
Build objective Rune
low
WORK-013 main
Build partner Rune
low
WORK-014 main
Build job Rune
low
WORK-016 main
Build album Rune
low
WORK-017 main
Build artist Rune
low
WORK-165 main
Lint cli-plugin shape in refrakt package validate
Add a lint pass to refrakt package validate that checks a package's cli-plugin export for structural issues — missing namespace, missing descriptions, malformed inputSchema, namespace conflicts with already-installed plugins. Catches problems at package-publish time rather than at runtime when the MCP server tries to advertise the broken tool.
low simple
0/7 criteria
WORK-171 main
Add refrakt config migrate command
Add a small migration command that rewrites a flat-shape refrakt.config.json into the nested form (site.* and explicit plugins). Optional for users — the flat shape stays valid indefinitely — but useful for projects adopting the unified config or moving to multi-site.
low simple
0/8 criteria
WORK-266 main
article-card reference card rune
The first core plain-presentational card rune — ordinary attributes, no $item/registry knowledge — shipped as the reference implementation for collection body templates. Proves the "cards are plain runes; the template wires entity fields into attributes" model.
low simple
0/4 criteria
WORK-273 main
Deprecate plan build and serve commands
Mark plan build and plan serve deprecated, pointing users at the site approach, once refrakt's own plan site proves the replacement. Keep the authoring CLI. Removing the bespoke render stack is a later release, out of scope here.
low simple
0/3 criteria
WORK-334 main
Chart renderer provider selection and additional providers
Demand-driven follow-up to the WORK-333 seam: ship renderers beyond the built-in svg (e.g. a charting library) and the SSR capability, on the provider model resolved in SPEC-083.Status: draft — demand-driven (not blocked). The provider model is settled (single rf-chart delegating to an app-registered ChartProvider; selection author → site-default → svg; theme orthogonal via tokens). This item only makes sense once there's a concrete need for a second renderer — building one speculatively is the YAGNI trap SPEC-083 warns against.
low unknown
0/6 criteria
WORK-343 main
Schema-declared achieved status for open-world rollups
The deferred "option B" from the WORK-296 achievement-status discussion. Today plan-progress computes its achieved subset with a hardcoded union of terminal statuses (value="status:/^(done|fixed|accepted|complete)$/", decision C). That is correct and minimal, but it bakes domain knowledge into the plan sugar and relies on achieved-status name uniqueness across types — which holds for the five first-party plan types but is not guaranteed for a third-party "trackable" type that introduces its own status lifecycle.This item makes achievement self-declared on each rune's schema so aggregate can derive the achieved set generically, the same open-world way SPEC-084 handles composability (knowledge lives with the party that has it).
low moderate
0/4 criteria
WORK-354 main
Responsive per-cell bento spans
Deferred granular follow-on to the bento collapse model (WORK-348). Once grid-level collapse + automatic progressive reduction are in place, the remaining need is per-cell responsive control — letting an individual tile declare its span per breakpoint.
low moderate
0/3 criteria
Ready 39
WORK-055 main
Learning Package Pipeline Hooks
high complex
0/11 criteria
WORK-094 main
Create @refrakt-md/vite plugin — Level 1 static transform
Build the core Vite plugin that intercepts .md files and emits JS modules with rendered HTML, frontmatter, SEO data, and serialized tree. This is the Level 1 (static, per-file) integration — no cross-page awareness.
high moderate
0/13 criteria
WORK-095 main
Vite plugin — virtual CSS module and tree-shaking
Implement virtual:refrakt/styles module that imports theme tokens, per-rune CSS, and package CSS. Supports tree-shaking to include only CSS for runes actually used in content.
high simple
0/9 criteria
WORK-261 main
Shared field-match parser
Implement the canonical field:value selector grammar from SPEC-070 as a single shared module in @refrakt-md/runes, consumed by collection, entityRoutes (SPEC-069), and backlog. The existing plugins/plan/src/filter.ts folds into it, gaining glob/regex, url resolution, and case-consistency while preserving backlog behavior.
high moderate
0/7 criteria
WORK-262 main
Deferred-body capture for per-entity templates
Implement the deferBody mechanism SPEC-070's prototype validated: a catalog flag plus a pre-transform pass in the content loader that captures a rune's pristine body as a source string and empties it, so postProcess can re-parse and transform it per entity with a bound variable. Capture must happen before the page transform — by schema-transform time Markdoc has already resolved the body's $item interpolations to undefined.
high moderate
0/5 criteria
WORK-267 main
contributePages pipeline phase
Add the Plugin.contributePages hook and a contribution phase in the content loader (after file-page registration, before aggregation) that collects ContributedPage[] and runs them through the normal pipeline — the underlying primitive both the entityRoutes adapter and third-party plugins build on.
high complex
0/6 criteria
WORK-340 main
Token hygiene: phantom-token reconciliation + vocabulary cleanup
Lumina's CSS references several colour tokens that are never defined, so each paints a stale literal fallback (a sky-blue from an old default theme, or a cool Tailwind gray) that doesn't track light/dark. This is the real cause of the "out of place" blue (e.g. the typography specimen background) and the cold-gray muted text in dark mode. Fix the drift at the source, reconcile the vocabulary, and keep the configurable shapes (presets, generator, docs) in correspondence.
high moderate
0/9 criteria
WORK-392 main
Multi-site support in refrakt edit
refrakt edit cannot launch in a multi-site project: EditOptions is just port/contentDir/devServer/noOpen, and resolveSite() throws when multiple sites are declared, telling the user to pass --content-dir — which bypasses config resolution entirely, losing plugins, tints, icons, and route rules. Refrakt's own repo (sites main + plan) hits this. Add a --site flag and an in-editor site switcher so the editor works first-class against multi-site configs.
high moderate
0/5 criteria
WORK-393 main
Registry-aware block preview in the editor
In block mode, registry-resolved runes — collection, relationships, aggregate, xref, expand, and data-bound sandbox — render as unresolved sentinel shells with no explanation. They resolve in core postProcess against coreData.registry, which the client-side block renderer never runs; RUNTIME_ONLY_TYPES in block-renderer.ts only placeholders nav*. The server already holds the registry and resolvers (the full-page iframe preview uses them), so render these blocks server-side; where that's not possible, show an honest placeholder instead of an empty shell.
high moderate
0/5 criteria
WORK-417 main
data rune preprocessor + CSV/JSON adapters
The tier-1 foundation of SPEC-103: a preprocess-time data rune that reads a sandboxed external file and emits a Markdoc table AST node, plus the CSV/TSV/JSON/NDJSON adapters and the shared projection/typing core. SQLite and any remote source are explicitly out of scope (later work items). Proves the headline claim — chart and datatable consume the emitted <table> with no edits.
high complex
0/6 criteria
WORK-428 main
bg guest body + engine relocation + bare-surface guardrail
The gate for SPEC-104: teach bg to host a live sandbox as a bare, presentational, full-bleed backdrop. Covers §1–§4 — the constrained body, the engine relocation that mirrors bg-video, the bare-surface guardrail, and boot-frame layering. Everything downstream (the preset, the showcase) builds on the data-bg-guest contract this establishes.
high complex
0/5 criteria
WORK-429 main
sandbox bg preset (transform-resolved)
SPEC-104 §5: make a reusable sandbox backdrop applicable by name (bg="midnight-waves") like any other preset, by adding a sandbox descriptor to BgPresetDefinition — resolved at transform time (not the identity engine, which has no file access), expanding into the WORK-428 data-bg-guest body.
high complex
0/4 criteria
WORK-431 main
reveal/stagger engine facet
The gate for SPEC-105 (§1–§3): a shared, closed reveal modifier plus an orthogonal stagger modifier on section-level runes, emitting the generic data-* hooks and the per-child index the motion CSS and behaviour read. Pure intent → attributes; no look here.
high moderate
0/3 criteria
WORK-432 main
Motion dimension CSS + tokens
SPEC-105 §4: a single dimensions/motion.css + motion tokens that render each reveal character — covering all section runes from one stylesheet, with the transform-composition and global-hook rules that keep it from becoming per-rune work.
high moderate
0/4 criteria
WORK-433 main
reveal IntersectionObserver behaviour + enhancement gating
SPEC-105 §5–§6: the timing trigger and the no-JS/SSR safety. A tiny IntersectionObserver behaviour flips data-in-view; enhancement gating guarantees the static page is always complete. JS = when, CSS = how.
high moderate
0/3 criteria
WORK-052 main
Create-Refrakt Project Type Defaults
medium simple
0/6 criteria
WORK-053 main
CSS Fallback Resolution for Third-Party Packages
medium moderate
0/6 criteria
WORK-056 main
Editor Background Entity Registry
medium complex
0/10 criteria
WORK-057 main
Editor Registry-Powered Autocomplete
medium moderate
0/7 criteria
WORK-096 main
Vite plugin — dev server HMR
Implement hot module replacement for .md file changes during development. When a markdown file is saved, re-transform it and trigger a page update.
medium simple
0/6 criteria
WORK-097 main
Vite plugin — Level 2 cross-page pipeline
Implement the level: 'pipeline' mode that runs the full four-phase cross-page pipeline at build time, enabling breadcrumbs, nav, glossary auto-linking, and other entity-dependent features.
medium moderate
0/11 criteria
WORK-115 main
Migrate community package postTransform uses to declarative config
With WORK-110 through WORK-114 complete, convert the 5 postTransform uses identified in SPEC-033 to their declarative equivalents. Validate identical HTML output before and after each migration.
medium moderate
0/7 criteria
WORK-116 main
Update inspect and contracts tooling for structure slots features
Update refrakt inspect and refrakt contracts to surface the new SPEC-033 features: slot assignments, projection effects, and repeated elements.
medium moderate
0/7 criteria
WORK-265 main
Shared markdoc formatter functions
Register a small set of author-facing markdoc functions — currency, date, number, join — in @refrakt-md/runes as the shared value-formatting layer, usable anywhere markdoc transforms run: collection cells, body templates, and entityRoutes render strings. Keeps formatting out of fields and out of any bespoke projection DSL.
medium simple
0/4 criteria
WORK-269 main
embed() embeddability contract
Generalize SPEC-066's sourceFile + extract into the embed() contract: an entity is embeddable if it has embed() or (sourceFile + extract). expand and the entityRoutes adapter accept either, so external plugins can make entities embeddable without a source file on disk.
medium moderate
0/4 criteria
WORK-341 main
Dark-mode token parity audit
Make dark-mode token coverage deliberate. Most "dark looks off" reports trace to the phantom tokens fixed in WORK-340 (a phantom can't have a dark value); this item closes the genuine remaining gaps and records the intentional shared-token decisions.
medium simple
0/4 criteria
WORK-350 main
Rebuild index composability section as a bento showcase
Capstone + real-world validation. Replace the current split-feature composability section on the site index (a juxtapose of two sandboxes) with a richer bento grid where each cell is a different live rune composition — the section demonstrates composability by being a composition. It doubles as the hero example atop the new Compositions docs category (WORK-346) and as the dogfood proof that the bento substrate works end to end.Now that the v0.20.0 surface model has shipped, the showcase can flex the new surface vocabulary too — so the grid demonstrates both composition axes (a guest in a media zone, and the surface treatment around it).
medium moderate
0/7 criteria
WORK-351 main
Theme-aware global chrome: selection, scrollbars, color-scheme
Three pieces of browser chrome currently ignore the theme. Make them token-driven and mode-aware.
medium simple
0/4 criteria
WORK-352 main
Focus-visible and reduced-motion consistency
Accessibility polish across the theme. Today only ~5 of ~90 rune CSS files define :focus-visible, and only 2 honor prefers-reduced-motion — so keyboard focus is inconsistent and animations don't degrade for motion-sensitive users.
medium moderate
0/4 criteria
WORK-391 main
group-order attribute on collection, aggregate, relationships
Implements SPEC-095: an explicit group-order attribute so authors can sequence groups over a non-enum field (e.g. category, plugin, edge kind), which today render in arbitrary insertion order.
medium moderate
0/7 criteria
WORK-394 main
Close editHints coverage gaps across rune packages
editHints drive click-to-edit in the block editor; every rune without them is one where clicking a section silently does nothing. Coverage today is 93/130 runes (71.5%): business, design, docs, places, and storytelling are at 100%, but core is at 58% (35/60), plan at 45% (5/11), media at 60% (3/5), learning at 67% (2/3), and marketing at 80% (12/15). Close the gaps using the established SPEC-009 playbook (visible elements as refs/data-name, hints declared in the rune's config).
medium moderate
0/5 criteria
WORK-395 main
Surface pipeline warnings in the editor
The engine grew a rich soft-lint system (posture demotion, escape-hatch lints, nesting validation, entity-id collisions) but the editor actively swallows it: runPreviewPostProcess in packages/editor/src/preview.ts collects PipelineWarnings into an array and drops it, and hook errors hit a bare catch {} ("degrade silently"). Authors only discover problems at build time. Pipe warnings through to the UI as a validation rail.This is the warning channel that SPEC-098's inline lints build on.
medium simple
0/5 criteria
WORK-397 main
Relocate bento and bento-cell from marketing to core runes
Execute ADR-019: move bento + bento-cell from @refrakt-md/marketing to core (@refrakt-md/runes + @refrakt-md/lumina) as Layout primitives, with a back-compat re-export shim from marketing. Not a blocker for WORK-350; target a future minor.
medium moderate
0/6 criteria
WORK-430 main
bg sandbox guest — docs + showcase
SPEC-104 §6 + docs: document the bg guest body, the bare-surface guardrail, the sandbox preset (with the refrakt.config.json example), and the boot-frame layering; ship the music-blog backdrop pattern as a working showcase exercising the layout-cascade + SPEC-006 audio-bridge composition.
medium moderate
0/4 criteria
WORK-434 main
Motion dimension — docs + showcase
SPEC-105 §7 + docs: a theme-authoring motion dimension page and an author-facing reveal/stagger reference, plus a feature-stagger demonstration.
medium moderate
0/3 criteria
WORK-439 main
Visual-regression compare-against-base CI job
Deferred from WORK-409 (its final acceptance criterion). The harness runs end-to-end locally and in the pinned Playwright container; what's left is the CI automation, which needs a browser-backed runner to develop against — hence its own item, unassigned to a milestone until a browser CI environment is in place.
medium moderate
0/3 criteria
WORK-058 main
Pipeline Incremental Build Optimization
low complex
0/9 criteria
WORK-098 main
Vite plugin — behavior init helper export
Export a thin initBehaviors() wrapper from @refrakt-md/vite/behaviors that frameworks can call after navigation to re-initialize interactive rune behaviors (accordion, tabs, datatable, etc.).
low trivial
0/6 criteria
WORK-332 main
Remove the legacy data-field engine machinery (Tier 2)
Internal-only cleanup that lands the rest of WORK-323 once WORK-331 has stopped emitting the dual-emit metas. Remove the now-dead legacy read/strip path so data-rune-fields is the engine's only field-data input. No external/contract benefit beyond Tier 1 — this is for a single internal representation and a smaller engine.
low moderate
0/4 criteria
In Progress 3
WORK-051 main
Editor Package Awareness
high complex
3/8 criteria
WORK-089 main
Create @refrakt-md/astro adapter package
Build the Astro framework adapter — the first non-SvelteKit target. Astro is MPA-first and SSG-focused, making it the simplest adapter to build and validate.
high moderate
11/12 criteria
WORK-438 main
Skeleton/skin re-bucketing of the Lumina CSS
The wholesale pass the WORK-410 spike sized: re-bucket Lumina's CSS into the two @layers per the spike's cut-line rule, so structure ships in @refrakt-md/skeleton and aesthetics stay in Lumina's skin. Mechanical and low-risk per declaration, but large (~114 files / ~6,058 declarations; the spike estimates ≈40% skeleton / 55% skin / 5% content).
high complex
0/3 criteria
Review 3
WORK-293 main
Ship the client behaviors bundle in the html scaffold
The @refrakt-md/html scaffold (create-refrakt template-html) emits static HTML with no client JS — build.ts never bundles or references initPage() from @refrakt-md/html/client. So no interactive behavior runs in a scaffolded html site: tabs, accordion, search, and (since SPEC-073) the theme-toggle button are all inert. The adapter ships the client runtime (@refrakt-md/html/client + @refrakt-md/behaviors); the scaffold just never bundles and includes it.Discovered while finishing WORK-292: the html adapter now injects the no-flash pre-paint script (which works without JS), but the toggle can't cycle until the behaviors bundle loads. This is broader than the toggle — it's the html scaffold's general interactivity gap.
medium moderate
3/4 criteria
WORK-346 main
Rune compositions docs category
The composability investigation surfaced ~25 meaningful rune combinations — far more than fit in the authoring guide. Create a dedicated "Compositions" docs category, page-per-pattern: each page shows the Markdown you write, the rendered result (via preview), and a one-liner on which zone/mechanism makes it work. Start with Family A (a visual rune in a container's media zone), the set being made first-class this milestone.
medium moderate
WORK-380 main
Surface-model showcase gallery
The v0.20.0 surface model shipped with per-rune reference docs (card cover, recipe cover, bg, surfaces.md) but no single page that shows the vocabulary as a system. Build a dedicated showcase gallery that demonstrates the whole surface model on one page — the "wow" surface a visitor lands on to grasp what the model can do — organised by the model's own axes.
medium moderate
Done · 222 archived 100
WORK-358 main
Engine config variants: RuneConfig.variants type + axis validation
Add the variants field to RuneConfig — modifier-keyed config deltas — and validate at config load that every variant axis is a declared modifier. This is the foundational type + validation layer for engine config variants.
critical moderate
3/3 criteria
WORK-314 main
Engine: block-and-layout projection model
Infrastructure for SPEC-080. Adds blocks and layout to RuneConfig and the engine projection that composes a rune's transform tree with projected metadata blocks, placed explicitly into named containers. Built behind the new fields so the SPEC-079 path (zones / zoneLayouts / contentSlots / order / zoneHost / zoneHostPlacement) and the legacy slots / structure shim keep working untouched during the migration.
high complex
5/6 criteria
WORK-315 main
bar layout, intrinsic field shape, code metaType
The rendering primitives SPEC-080 depends on: a single bar horizontal layout (merging split + chip-row), field shape decided intrinsically from metaType, a new code metaType, and the rename of the unreleased eyebrow rune to bar.
high moderate
5/5 criteria
WORK-316 main
Migrate plan package to blocks/layout
Re-migrate the plan family (work, spec, bug, decision, milestone) from the SPEC-079 metaFields + zones model (WORK-306, done) to the SPEC-080 blocks/layout model. The metaFields manifest is reused as-is; the zones / contentSlots / order / dispatcher reliance is replaced by transforms that build named-block trees plus blocks / layout config. This is the bulk of the SPEC-080 migration — the plan family leans hardest on the engine dispatcher.
high complex
4/4 criteria
WORK-317 main
Migrate learning package to blocks/layout
Re-migrate recipe + howto from the SPEC-079 zones model (WORK-308 plus this branch's recipe/howto work) to the SPEC-080 blocks/layout model. These runes already build content + media trees and nest the metadata def-list via zoneHost / zoneHostPlacement, so they map almost directly.
high moderate
3/3 criteria
WORK-318 main
Migrate docs package to blocks/layout (api proof)
Migrate the docs meta-bearing runes (Api, Symbol; Changelog untouched) straight to the SPEC-080 blocks/layout model. api is the deliberate proof point: method/auth render as chips and path renders as a bare <code> — all from metaType, in one flat bar — with no layout-specific or slot-specific logic.Supersedes WORK-309, which migrated docs to SPEC-079 zones (path as metaType: 'id' mono, method/path as split left/right). Skip the now-obsolete zones step and go directly to blocks/layout. api is still on the legacy structure path today, so this is its first real migration.
high moderate
3/4 criteria
WORK-321 main
Reserved fields attribute + schema dual-emit
Step 1 of SPEC-082. Introduce the typed field-data channel: rune schemas write their field values to a single reserved attribute, data-rune-fields, holding a JSON-encoded object — produced by createComponentRenderable (properties populate it). Keep emitting the legacy <meta data-field> children in parallel (dual-emit) so behavior is unchanged. No engine changes in this step.
high moderate
5/5 criteria
WORK-322 main
Engine reads the fields attribute (dual-read)
Step 2 of SPEC-082. The engine resolves modifierValues / metaFields from the parsed data-rune-fields first, falling back to the legacy <meta data-field> children when a key is absent. Parse the reserved attribute once per node. With both channels carrying the same data (after WORK-321), output is unchanged.
high moderate
5/5 criteria
WORK-324 main
Recursive layout assembly engine
The engine primitive for SPEC-081. Generalize composeContainer into a recursive resolver over a name-keyed layout, so the config can create the structural skeleton (preamble / content / media wrappers) rather than only ordering containers the transform pre-built.
high complex
5/5 criteria
WORK-328 main
Migrate pre-engine field consumers to the fields bag
WORK-322 migrated the engine to read data-rune-fields, but the field metas have other readers that run on the pre-engine tree and still read field values from <meta data-field>. They must move to the bag before the metas can be dropped (WORK-323) — otherwise entity registration and SEO break.
high moderate
5/6 criteria
WORK-329 main
Untangle schema.org SEO metas from the data channel
Resolves SPEC-082 problem #4 (SEO double-booking) — the blocker for WORK-323. Some property metas are conflated: they carry both data-field (data, now in the bag via WORK-321 / WORK-322 / WORK-328) and property= from the schema map (e.g. recipe's prepTime / cookTime / servings). Split the two so the data channel (bag) and the schema.org channel (property= metas) are independent — only then can WORK-323 drop the data metas and remove the kebab set + meta-strip filter.
high moderate
6/6 criteria
WORK-359 main
Per-instance variant resolution and merge over base config
Resolve each variant axis per instance and merge matching deltas over the base config before layout assembly, reusing the existing mergeThemeConfig machinery.
high complex
3/3 criteria
WORK-360 main
Per-variant structure contracts and inspect variant selection
Make structure contracts and CSS-coverage per-variant, and let refrakt inspect render a variant via the selecting modifier value.
high moderate
3/3 criteria
WORK-361 main
Migrate card/bento-cell to flat-slot model; feature grid/stack + cover variants
Migrate card/bento-cell to the SPEC-081 flat-slot + base-layout model (prerequisite for the cover variant), migrate feature's grid/stack conditional out of its transform into a media-position variant, and document the variants primitive.
high complex
4/4 criteria
WORK-362 main
Universal elevation attribute backed by a --rf-shadow-* token scale
Add a universal elevation attribute backed by a shared --rf-shadow-* token scale and migrate bespoke per-rune shadows onto it.
high moderate
3/3 criteria
WORK-363 main
frames preset registry + frame attribute and inline facet overrides
Add a frames preset registry parallel to backgrounds, the frame attribute with inline facet overrides, and complete the offset named scale.
high complex
4/4 criteria
WORK-364 main
frameTarget routing + host-owned clip + shared frame CSS layer
Add RuneConfig.frameTarget routing, the host-owned clip contract, the oversize opt-out, a shared frame CSS layer, and reconcile with bento's existing media vars.
high complex
5/5 criteria
WORK-366 main
Tint-tracking inset surface: --rf-surface-inset-shift token + use-site color-mix
Add the tint-tracking inset surface: a --rf-surface-inset-shift mix-amount token and a use-site color-mix recipe applied to media wells and chart/diagram.
high moderate
4/4 criteria
WORK-398 main
Hero as a cover host
hero grammatically accepts media-position="cover" but has never been styled or tested for it (SPEC-101 §1–§3, §6). The engine side (scrim, foreground flip, posture demotion) already fires for hero — and hero emits the anatomy cover.css keys on — so this item is the hero-side delta: config variant parity with card, a band-appropriate height authority, padding rerouting, and an overlay legibility pass.
high moderate
6/6 criteria
WORK-399 main
Cover guest fill and sandbox fill height mode
cover.css stretches only img/video to fill the media well; any other guest — a sandbox above all — sits at its own height. CSS alone can't fix the sandbox case: the custom element (packages/behaviors/src/elements/sandbox.ts) sets an inline iframe height (fixed px, or live auto-resize via rf-sandbox-resize postMessage when data-height="auto"), which fights a host-owned height. This item makes any guest fill a cover well, with sandbox height="fill" as the mechanism for the live case (SPEC-101 §4). Benefits every cover host (card, bento-cell, hero alike).
high moderate
5/5 criteria
WORK-404 main
Typography token contract
Extend the SPEC-048 TokenContract with a real typographic system. Today the contract carries only font.sans / font.mono — no scale, leading, weight, or tracking — so typographic identity (the primary differentiator for editorial/magazine themes) is not themeable. This is the gate for the SPEC-094 Tier 1 foundations.
high moderate
4/4 criteria
WORK-405 main
Lumina typography refactor onto tokens
Replace Lumina's hardcoded typography with the WORK-404 tokens. Today there are ~351 hardcoded font-size declarations against 5 tokenized — so an editorial theme wanting a different scale must override hundreds of declarations across 90 files. Tokenizing here is also what shrinks the WORK-410 skeleton/skin spike's classification surface.
high complex
3/3 criteria
WORK-407 main
Gallery generator — rune subject
A CLI command that emits a deterministic static rune gallery: every rune across its variant matrix, on one page, rendered through the HTML adapter. This is the AI-iteration surface and the deterministic subject the harness (WORK-409) photographs.
high complex
4/4 criteria
WORK-409 main
Visual-regression harness
A shared Playwright harness that photographs the generated gallery + layout fixtures and diffs them against a baseline. This closes the AI iteration loop and — critically — gives the v0.23.0 skeleton/skin extraction its "diff must be empty" proof. No screenshot testing exists in the repo today; this is greenfield.Baselines are ephemeral, not committed. Fixtures and theme CSS churn constantly, so committed golden PNGs would mean endless binary diffs and a re-baseline commit on nearly every PR — noise that trains everyone to ignore the check, plus repo bloat. Instead the baseline is whatever you compare against in the moment (__screenshots__/ is gitignored): capture-then- compare locally, or compare-against-base in CI.
high moderate
4/5 criteria
WORK-410 main
Skeleton/skin split — spike
The gating spike for the v0.23.0 wholesale extraction. The skeleton/skin cut is a per-declaration design call (structure and aesthetics are braided inside single rules), so settle it empirically on a small slice before committing to the public contract every future theme depends on.
high moderate
3/3 criteria
WORK-411 main
Fixture format, loader & generated manifest
The foundation of SPEC-102: pin down the fixture format and unify the four fragmented stores into one source the CLI, gallery, editor, and reference all read. The WORK-407 gallery exposed the cost of the status quo — getFixture reads only cli/lib/fixtures.ts (13 runes), ignores RUNE_EXAMPLES (24), and 25 runes fall back to a naive stub that renders wrong (<p> inside an inline badge span).
high complex
4/4 criteria
WORK-412 main
Complete the standardised fixture corpus
With the format + loader in place (WORK-411), author a good fixture for every rune so the gallery, editor, and inspect render the whole catalogue correctly. The WORK-407 gallery surfaced ~25 runes with no real fixture (rendering the broken stub) and several child runes shown standalone.
high complex
4/4 criteria
WORK-423 main
elevation depth-ladder axis
Turn elevation into the universal chrome/depth axis from SPEC-107: an ordered semantic ladder emitted as data-elevation, superseding both §8's surface enum and today's shadow-only none/sm/md/lg scale. The foundation the rest of the milestone builds on.
high complex
5/5 criteria
WORK-424 main
prominence axis (page-section family)
Add the header-emphasis axis from SPEC-107: prominence scales a rune's page-section header (eyebrow / title / blurb / rhythm), selecting its typographic register. Unlike elevation it is not universal — it is available only to runes that carry the page-section header model.
high moderate
3/3 criteria
WORK-425 main
Lumina: map the axes + retire the static surface groups
Paint the SPEC-107 axes in Lumina and retire the rune-name lists in surfaces.css — the last cross-rune file that enumerates runes (SPEC-094 §8).
high complex
3/3 criteria
WORK-435 main
Spacing token contract + Lumina refactor
The prerequisite the WORK-410 spike surfaced: a clean skeleton/skin split needs spacing to be tokenized, exactly as the type split needed WORK-404/WORK-405. Skeleton references spacing tokens by name; skin owns their values — but today Lumina hardcodes magnitudes (0.5rem, 0.375rem, 0.8125em, …), so the skin layer can't retune them without restating structure. The gate for the re-bucketing.
high complex
3/3 criteria
WORK-436 main
@refrakt-md/skeleton package + @layer infrastructure
Stand up the packaging + cascade-layer infrastructure the WORK-410 spike settled, so skeleton and skin can ship and version separately. The structural home the re-bucketing fills.
high moderate
3/3 criteria
WORK-296 main
Decompose plan-progress as sugar over aggregate
With the generic aggregate rune in place (WORK-294), plan-progress becomes thin sugar over aggregate — same pattern as backlog / decision-log / plan-activity wrapping collection. plan-progress's current rendering (the progress bar + per-status badge row) is exactly the aggregate composition; we just need plan-specific defaults baked in so the call site stays {% plan-progress /%}.
medium moderate
8/8 criteria
WORK-305 main
Engine + layout primitives + composable runes + Lumina chip-universal
Implements Phase 1 of SPEC-079 on the engine + theme side, without yet migrating the plan plugin (that lands in WORK-306). Three layout primitives, two composable runes, the universal chip primitive, the legacy slots + structure shim, and config-load validation.
medium complex
16/16 criteria
WORK-306 main
Plan plugin migration to metaFields + zones
Phase 1 proof case for SPEC-079. Migrates the plan plugin's entity runes (work, bug, spec, decision, milestone) from the legacy slots + structure config shape to the new metaFields + zones + sections model. Lands together with WORK-305 so v0.18 ships the spec end-to-end.
medium moderate
9/9 criteria
WORK-307 main
Storytelling plugin migration to metaFields + zones
Phase 2 of SPEC-079. Migrates the storytelling plugin's meta-bearing runes (Character, Realm, Lore, Faction, Plot) from the legacy slots + structure config shape to the new metaFields + zones + contentSlots model. No visual change — Phase 1 already moved the chip look universally via Lumina's dimensions/metadata.css rewrite + the universal .rf-badge class. Phase 2 is purely config-shape cleanup.
medium moderate
6/6 criteria
WORK-308 main
Learning plugin migration to metaFields + zones
Phase 2 of SPEC-079. Migrates the learning plugin's meta-bearing runes (HowTo, Recipe) from the legacy slots + structure config shape to the new metaFields + zones + contentSlots model.
medium simple
6/6 criteria
WORK-309 main
Docs plugin migration to metaFields + zones
Phase 2 of SPEC-079. Migrates the docs plugin's meta-bearing runes (Api, Symbol) from the legacy slots + structure config shape to the new metaFields + zones + contentSlots model.
medium simple
0/6 criteria
WORK-310 main
Places plugin migration to metaFields + zones
Phase 2 of SPEC-079. Migrates the places plugin's meta-bearing rune (Event) from the legacy slots + structure config shape to the new metaFields + zones + contentSlots model.
medium simple
0/6 criteria
WORK-311 main
Media plugin migration to metaFields + zones
Phase 2 of SPEC-079. Migrates the media plugin's meta-bearing runes (Track, Audio) from the legacy slots + structure config shape to the new metaFields + zones + contentSlots model.
medium simple
0/5 criteria
WORK-319 main
Migrate remaining rune packages to blocks/layout
Once api proves the model (WORK-318), migrate the remaining meta-bearing runes to SPEC-080 blocks/layout: storytelling (re-migrate faction / realm / character + lore / plot / others), marketing, business, places, media, design, and core runes (e.g. budget).Supersedes WORK-310 (places), WORK-311 (media), and WORK-312 (core budget) — those targeted SPEC-079 zones; migrate straight to blocks/layout instead. May be split into per-package sub-items during execution.
medium complex
5/5 criteria
WORK-320 main
Remove legacy placement fields; finalize contract + docs
Once every rune is on blocks/layout (WORK-319), remove the superseded SPEC-079 placement surface from RuneConfig + engine and finalize the contract. Coordinate with WORK-313 (remove the legacy slots / structure shim) so only blocks/layout plus the projection / postTransform escape hatches remain.
medium moderate
7/7 criteria
WORK-323 main
Drop data-field metas; delete the side-channel cruft
Step 3 of SPEC-082 — the payoff. Stop emitting <meta data-field>; the engine reads only data-rune-fields (parse once, strip the reserved key before output). Delete the legacy meta-read path, the meta-strip filter, the kebab-matching set, and the unconsumed-meta leak filter. Genuine schema.org / SEO <meta property> tags are untouched.
medium moderate
0/5 criteria
WORK-325 main
Flatten rune transforms to flat-emit + declarative grouping
Migrate the runes that hand-build structural skeletons in TypeScript to emit a flat bag of data-name slots (content interpretation only) and declare their preamble / content / media grouping via the recursive layout from WORK-324. Output stays identical; the grouping moves from imperative code to config.
medium complex
5/5 criteria
WORK-326 main
Move semantic derivation out of postTransform (budget totals)
Apply the SPEC-081 computation boundary: semantic derivation belongs in the rune transform, not the presentation postTransform. Budget's grand / per-category / per-day totals are the worked example — a theme-invariant fact about the content currently stranded in the engine's escape hatch.
medium moderate
5/5 criteria
WORK-331 main
Drop dual-emitted data-field metas from rune output (Tier 1)
Re-open the high-value slice of WORK-323 (descoped as a whole): stop emitting the dual-emit modifier/field <meta data-field> tags so the data-rune-fields bag is the only representation of field data in the rune tree. The risk being closed is that theme developers treat data-field metas as part of the output contract; this removes them from the pre-engine tree (they are already stripped from rendered output) without touching the engine input contract.
medium moderate
6/6 criteria
WORK-333 main
Chart seam: semantic table IR + rf-chart web component (svg only)
Land the SPEC-083 seam. Move chart onto the two-layer boundary: the data becomes a real <table> in the transform, and the rendering moves into an rf-chart web component that draws svg, full stop. No provider attribute, no registry, no selection — that abstraction is WORK-334, gated on a real second renderer. Chart stays in core; no new package.
medium moderate
8/8 criteria
WORK-335 main
Move structural building out of postTransform into rune transforms (embed/diagram/sandbox/mockup/comparison)
Apply the SPEC-081 computation boundary to the five runes whose engine postTransform hand-builds deterministic, theme-invariant structure from self-emitted data — the same misplacement WORK-326 fixed for budget. (Chart is excluded — its rendering is a genuine variation point and gets its own design in SPEC-083.)
medium complex
5/5 criteria
WORK-336 main
Audit and rationalize rune context modifiers
Review every declared contextModifiers entry across core and plugins, decide whether the pairing is meaningful, and either style it or remove it. The lone KNOWN_MISSING_SELECTORS context entry — Hero's feature → in-feature — is the first casualty: it has no sensible rendering, so the modifier comes out rather than getting CSS.
medium simple
4/4 criteria
WORK-337 main
Enforce parent nesting at build time
Turn RuneConfig.parent into a validated, self-declared requiresParent constraint (SPEC-084). A child rune that declares it must live inside a given parent, but appears outside it, surfaces a diagnostic instead of rendering silently-broken output. Crucially this is open-world: only a rune that self-declares a requirement is ever checked — the framework keeps no registry of allowed children, so third-party runes on either side just work.
medium moderate
5/5 criteria
WORK-338 main
Composability authoring contract + CLI coverage audit
The authoring-facing half of SPEC-084: a contract guide for rune authors plus a CLI audit. (The end-user catalog of concrete compositions lives separately in the "Compositions" docs category, WORK-346 — this item is the "how the contract works" reference, not the recipe book.)
medium moderate
5/5 criteria
WORK-339 main
Media-zone guest adaptation (any visual rune sits cleanly in a media zone)
Per SPEC-084's open-world styling rule, a container adapts its slot, not the specific guest. Containers that already expose a media zone (card, feature, hero, recipe) should size/clip any visual rune dropped into that zone — map today, chart/gallery/diagram/embed/sandbox next — via one name-agnostic selector, rather than per-pair styling. map-in-card is the proof case.
medium moderate
7/7 criteria
WORK-342 main
Modernize plan card-sugars to compose with the bar rune
The plan sugars backlog, decision-log, and plan-activity lower to collection with bespoke card/table bodies that predate the bar rune. Rebuild their default bodies to compose from bar and give backlog a layout passthrough — while keeping the rollup faithful when the query mixes entity types.
medium moderate
8/8 criteria
WORK-345 main
Bento cell adopts card's zone contract; bento becomes a grid primitive
Two structural foundations from SPEC-085: give bento-cell the same zone structure as card, and stop modelling bento as a page-section.
medium moderate
9/9 criteria
WORK-347 main
Explicit bento-cell authoring
Make {% bento-cell %} a first-class authoring path for full per-tile control (the dashboard use case), alongside the heading sugar. Today the bento-cell tag is registered but convertHeadings would swallow a hand-authored cell into the preceding heading's content, so explicit authoring doesn't actually work.
medium moderate
5/5 criteria
WORK-348 main
Bento sizing model, size-derived media placement, and link tiles
Land SPEC-085's sizing model and the placement/link affordances. One grid, one vocabulary: a 6-column default, proportional size presets, and precise cols/rows.
medium moderate
11/11 criteria
WORK-349 main
Aggregate chart layout
Close the one gap between "we have the data" and "we can chart it." Plan entities are already registered in the main site's registry, so {% aggregate type="work" group="status" %} returns real counts today — but aggregate can only render an inline integer or a body-zoned template, not a chart. Add a layout="chart" mode that renders the grouped counts as an SVG, reusing the rf-chart renderer from WORK-333. This is the SPEC-076 "chart layout" future extension, and the clean "data rune feeds viz rune" composition.
medium moderate
6/6 criteria
WORK-353 main
Chart theming contract and SVG reference implementation
Today the rf-chart web component hardcodes its palette (a JS array of semantic token refs) and all geometry (bar width bw*0.75, point r:4, stroke/ font/ gridline sizes). A theme has no say over bar thickness, series colours, etc. Define a provider-agnostic theming contract — a --rf-chart-* custom-property surface — and make the built-in SVG renderer the reference implementation of it.
medium moderate
8/8 criteria
WORK-356 main
Bento levels — heading→footprint ladder
Implement the author-defined levels ladder for bento's heading-sugar path, per ADR-013. One attribute replaces the need for the removed sizing/span mode: a user who wants the old uniform-width grid writes levels="6,5,4,3,2,1".Queued deliberately — the design is settled in ADR-013; left to marinate before implementation.
medium moderate
9/9 criteria
WORK-357 main
Per-group sentiment projection in aggregate (colour plan-progress badges)
The deferred half of WORK-296. plan-progress now lowers to an aggregate composition whose per-status badges render neutral — the badge rune keys colour off data-meta-sentiment, and aggregate does not project a per-group sentiment onto $item, so the body has nothing to feed it. This is SPEC-076's listed future extension — "per-group sentiment projected onto $item, derived from the rune's domain ordering when the group field has a sentiment-mapped enum." The status→sentiment maps already exist in the plan config (plugins/plan/src/config.ts metaFields.status.sentimentMap per type: work done→positive, bug fixed→positive, blocked→negative, …) but are invisible to the generic resolver.
medium moderate
5/5 criteria
WORK-365 main
Collapse showcase into the frame model with deprecated aliases + docs
Re-express showcase as frameTarget: 'self' consuming frame, with deprecated aliases for its old attributes (breakout bleed retained), and document the surface model.
medium moderate
4/4 criteria
WORK-367 main
substrate pattern attribute: engine enum + shared base gradient stylesheet
Add the substrate pattern attribute with a fixed engine-level enum and a shared, always-included base stylesheet of token-driven gradient recipes.
medium moderate
4/4 criteria
WORK-368 main
substrateTarget routing + build validation + surfaces theme-authoring docs
Add substrateTarget routing (default self, theme-overridable, author wins), media-well binding and validation, and document the three fill layers.
medium moderate
3/3 criteria
WORK-369 main
bg gradient fill: inline facets + structured BgPresetDefinition.gradient
Add a token-driven bg gradient fill via inline facets and a structured BgPresetDefinition.gradient preset field.
medium moderate
3/3 criteria
WORK-371 main
Structured overlay/scrim facets + raw-string overlay deprecation path
Split the conflated overlay string into a structured flat-wash overlay and a structured scrim legibility facet, with a deprecation path for the raw-string passthrough.
medium complex
4/4 criteria
WORK-373 main
media-position=cover layout + height authority (as a config variant)
Add media-position="cover" as an engine config variant (full/header scope) with the height-authority precedence, superseding the split knobs.
medium complex
4/4 criteria
WORK-374 main
content-place 2-axis logical overlay anchor + orientation-adaptive auto
Add content-place, a 2-axis logical overlay anchor active only in cover mode, with an orientation-adaptive auto default.
medium moderate
3/3 criteria
WORK-381 main
Sandbox lazy/poster activation
sandbox is eager today: the iframe is created and its dependencies load on page render (it has a height knob but no deferral). That's fine for a small demo, but a heavy sandbox — a three.js scene (WORK-382), a large framework demo — on a perf-sensitive page like the site index costs a chunk of load time we deliberately avoided (WORK-350 and WORK-380 both limited live iframes "to keep the landing page fast").Add a deferred-activation capability so a heavy sandbox can headline a page without the load-time hit — useful for any heavy sandbox, not just three.js.
medium moderate
5/5 criteria
WORK-382 main
three.js sandbox composition — a live program as a media guest
The compositions catalogue (WORK-346) shows visual guests in a media zone — images, charts, maps, diagrams. The ultimate flex is a running program: a sandbox runs arbitrary JS in an isolated iframe, so a live three.js scene drops into a card/bento media zone like any other guest. It makes the "the media zone holds anything" claim undeniable.sandbox already supports this with no new primitives: inline <script type="module"> importing three from a pinned CDN ESM URL, plus the existing height knob. The JS runs only in the browser, so the static build stays green.
medium moderate
4/4 criteria
WORK-396 main
Generic section rune (eyebrow/headline/blurb preamble + body)
A generic, content-agnostic section rune: the shared page-section header (eyebrow → headline → blurb → image) followed by an arbitrary body. It exists so a preamble-less grid primitive like bento can be introduced with a title and intro — the role the feature "runes that work together" block plays on the site index today. Unblocks WORK-350 (the bento capstone), which replaces that feature section with a section + bento.
medium moderate
6/6 criteria
WORK-401 main
Prism scene — the niwaki-refraction hero backdrop
The showcase scene for the animated hero background (SPEC-101 §7): the brand metaphor, literally. A slowly rotating prism; a thin stream of markdown glyph particles (#, *, >, {%) enters one face as a faint ishi-tinted beam (stone grey — undifferentiated input); fanned spectrum streams leave the other in the Niwaki syntax roles — wakaba (keyword green), sakura (function pink), matsu (pine — link/constant), momiji (string peach, punchy string-expression orange as an accent). Markdown in, structured meaning out, in the exact colours this site renders syntax in.
medium moderate
5/5 criteria
WORK-402 main
Docs — hero cover reference and animated prism background showcase
The capstone of SPEC-101: document hero-cover and ship the animated prism background as a live, authored example. There is currently no docs example of media-position="cover" on hero at all.
medium simple
5/5 criteria
WORK-403 main
Nested-density title sizing — full-density runes in compact hosts
Long-standing leak in the density dimension, surfaced by the SPEC-101 hero-cover docs: sections.css scaled titles with a descendant selector ([data-density="compact"] [data-section="title"] { font-size: 1.25rem }), which punches through nested densities — a full-density hero inside a compact preview renders its headline at 1.25rem, wildly unrepresentative of the real rune. The existing "nested density scoping" resets in density.css covered descriptions and meta ranks but never the title, and a value-based reset can't work for titles (each rune sets its own size).
medium simple
3/3 criteria
WORK-406 main
Generate Lumina token CSS from tokens.ts
Make tokens.ts the single source for Lumina's token CSS. Today tokens/base.css and tokens/dark.css are hand-authored mirrors of luminaTokens, kept in lockstep by token-config-coverage.test.ts — the file header even notes "a future build script that regenerates this file." Wire generateThemeStylesheet into the build so the mirror and its coverage test retire and drift becomes impossible.
medium moderate
4/4 criteria
WORK-408 main
Gallery generator — layout fixtures
Extend the gallery generator (WORK-407) to a second subject class: layout fixtures — representative sample pages rendered through each LayoutConfig so page chrome (header, nav, sidebar, TOC, mobile panel, footer) is visually covered. Chrome carries as much of a theme's identity as runes, and the skeleton/skin extraction touches styles/layouts/*, so this is what lets the harness guarantee hold for chrome, not just content blocks.
medium moderate
3/3 criteria
WORK-413 main
AI write mode draws fixtures as few-shot exemplars
ai/src/modes/write.ts hardcodes an "Example structure" in its prompt. Replace it with the unified fixtures — drawing each rune's rich/canonical fixture (with its notes) as in-context few-shot exemplars. No training pipeline; retrieval into the prompt only.
medium moderate
2/2 criteria
WORK-414 main
Fixture validation in CI
Guard the corpus: parse the frontmatter fields (the format established in WORK-411 strips the block; this work consumes it), validate them against the schema, support <rune>.<scenario>.md scenarios, and ensure every fixture parses + transforms. plugin-validate reports role coverage instead of only warning "no fixture".
medium moderate
4/4 criteria
WORK-416 main
Gallery: bundle behaviors so interactive/lifecycle runes render
The WORK-407 gallery renders the static pre-enhancement HTML, so custom-element / lifecycle runes render empty: diagram → <rf-diagram>, chart → <rf-chart>, nav → <rf-nav>, sandbox → <rf-sandbox>, map → ~nothing. Progressive-enhancement runes (accordion, details, tabs, …) render their no-JS fallback (all-expanded) rather than their real state. Including the behaviors client makes the lifecycle runes draw and the PE runes show their enhanced (representative) state.
medium moderate
3/3 criteria
WORK-418 main
Image-src scheme registry + resolver hook
The foundation for SPEC-106: recognise custom URL schemes in a Markdown image's src during the transform and resolve them to a renderable, before the generic <img> fallback. Custom schemes (placeholder:, icon:) already survive markdown-it's validateLink, so ![alt](scheme:arg) arrives as an image node with src intact.
medium moderate
3/3 criteria
WORK-419 main
icon: image-src resolver
The inline icon shorthand discussed when the icon rune landed: ![GitHub](icon:github) resolves to the named icon's inline SVG — the same source the {% icon %} rune uses.
medium moderate
3/3 criteria
WORK-420 main
placeholder: image-src resolver
![Portrait](placeholder:portrait) resolves to a generated, theme-tinted inline SVG placeholder sized to the named shape — deterministic, offline, screenshot-stable.
medium moderate
3/3 criteria
WORK-421 main
Migrate fixtures to placeholder: (drop the base64-PNG interim)
With the placeholder: resolver in place, swap the SPEC-102 fixtures' base64-PNG image blobs for clean ![alt](placeholder:<shape>) references, and confirm the image-consuming runes render the resolved SVG.
medium simple
2/2 criteria
WORK-426 main
Migration + docs for the surface axes
Land the breaking elevation rename safely and bring the site + docs onto the new vocabulary (SPEC-107 §5).
medium moderate
3/3 criteria
WORK-427 main
Demonstrate the axes: full-bleed hero recipe / playlist
Close the loop on the use case that motivated SPEC-107: the same content rune reading as a contained card and as a full-width hero, by composing the axes — no rune fork.
medium simple
2/2 criteria
WORK-437 main
Icon-from-config: lift embedded data-URI glyphs out of CSS
The "content, not CSS" finding from the WORK-410 spike (SPEC-094 §8's icon-from-config): rune CSS embeds glyph shapes as data:image/svg+xml mask-images. Move them to the theme icon registry so a theme swaps glyph sets without touching CSS.
medium simple
2/2 criteria
WORK-312 main
Core Budget rune migration to metaFields + zones
Phase 2 of SPEC-079. Migrates the core {% budget %} rune (the only core rune using meta-projection — currency, duration meta fields) from the legacy slots + structure config shape to the new metaFields + zones + contentSlots model.
low simple
0/6 criteria
WORK-313 main
Remove legacy slots + structure shim from engine
Phase 3 of SPEC-079. Removes the backwards-compat path in packages/transform/src/engine.ts that lets legacy slots: [...] + structure: {...} configs continue to render. Lands once all first-party plugins have migrated (WORK-306 through WORK-312 done) and the deprecation warning has been visible across at least one minor release.
low simple
8/8 criteria
WORK-327 main
Surface grouped skeleton in contracts; deprecate projection.group/relocate
Finish SPEC-081: teach the contract generator about declaratively-grouped skeletons, and retire the projection operations now subsumed by recursive layout.
low moderate
4/4 criteria
WORK-330 main
Stabilize the plan-site dogfood test under parallel load
packages/content/test/plan-site-dogfood-real.test.ts ("builds a browsable plan site from refrakt's real plan/ via entityRoutes + collection") flakes under full-suite parallel load — it failed on most npm test runs across the SPEC-082 work, yet passes reliably in isolation (~5–6s). It is a heavy, real-file pipeline build (reads the whole plan/ tree, runs the full content pipeline), so under vitest's parallel worker pool it appears to hit a timeout or a shared-resource race rather than a genuine assertion failure.This is pre-existing and unrelated to any one change — it just became visible because every SPEC-082 step ran the full suite.
low simple
4/4 criteria
WORK-344 main
Expose group metadata in collection item templates
When collection groups results, the per-item template can't see which group it belongs to or that group's size — so authors drop to aggregate for anything group-aware. Expose the group key (and count) on $item so grouped collections can render group context inline.
low simple
4/4 criteria
WORK-370 main
Formalize the bg raw-CSS escape hatch + project-config backgrounds merge
Promote BgPresetDefinition.style to a documented, intentional last-resort escape hatch and confirm the project-config backgrounds home with merge-over-theme semantics.
low simple
2/2 criteria
WORK-372 main
Soft-lint raw CSS covered by structured facets + bg reference docs
Add a build-time soft warning for raw CSS that a structured facet now covers, and document gradients/escape-hatch/overlay in the bg reference.
low simple
2/2 criteria
WORK-375 main
Default cover scrim bound to content-place
Turn on a default scrim in cover mode targeting the media surface, with direction following content-place.
low simple
3/3 criteria
WORK-376 main
Card intrinsic height/aspect knob for bg-only cards + card docs
Add a card intrinsic height/aspect knob for bg-only cards and document cover mode in the card reference.
low simple
2/2 criteria
WORK-377 main
Media-guest interaction model: presentational default + capability flag + fallbacks
Define media guests as presentational by default with an explicit interactive capability and a static fallback per interactive guest.
low moderate
2/2 criteria
WORK-378 main
href demotion of media guests + cover backdrop pointer-events
Demote a clickable container's media guest to presentational + pointer-events: none, and make a cover guest an inert backdrop unconditionally.
low moderate
3/3 criteria
WORK-379 main
Interaction-posture build warnings + posture reference docs
Emit the interaction-posture build warning and document the posture in the reference + composability docs.
low simple
2/2 criteria
WORK-400 main
Build warning for non-eager sandbox in a cover media zone
A cover-backdrop sandbox is inert (SPEC-090 posture demotion) and above the fold, so the WORK-381 activation affordances contradict it: visible is a no-op there and click's poster + "Run" control is a dead end on a pointer-events: none surface. Eager is the background mode; a non-eager sandbox under cover should warn at build time (SPEC-101 §5).
low simple
3/3 criteria
WORK-415 main
Fixture-authoring docs
Document the fixture format, frontmatter fields, the role (coverage-vs-exemplar) split, and the <rune>.<scenario>.md convention under the plugin/theme authoring section.
low simple
1/1 criteria
WORK-422 main
Image-scheme authoring docs
Document the image-src scheme sugar for content authors, and the data:svg caveat.
low simple
2/2 criteria