WORK-058
ID:WORK-058Status:ready

Pipeline Incremental Build Optimization

Priority:lowComplexity:complexMilestone:v1.0.0Source:SPEC-002

Criteria completion

Criteria completion: 0 of 9 (0%) checked; tracking started on Apr 21, no incremental history yet0%25%50%75%100%Apr 21Aug 13

Tracking started Apr 21 — check back for trends.

Summary

The full five-phase pipeline runs on every build. For large sites this can be slow. Incremental builds optimise by tracking which pages have changed and which entities are affected, selectively re-running only the necessary work.

This is a performance optimization — the pipeline already produces correct results. This work item makes it faster for large projects (100+ pages).

Acceptance Criteria

  • Phase 1 (Parse): only re-parses changed files; caches transformed ASTs for unchanged pages
  • Phase 2 (Register): only re-registers entities from changed pages; merges with cached entities from unchanged pages
  • Phase 3 (Aggregate): re-runs fully when any entity changes (aggregation depends on complete registry)
  • Phase 4 (Post-process): only re-processes pages whose content changed OR whose cross-page dependencies changed
  • Phase 5 (Render): only re-renders pages whose enriched AST changed
  • Dependency tracking: the pipeline knows which entity types/names each page's post-processing reads, so it can determine which pages need re-processing when an entity changes
  • Cache invalidation is correct — changing a character name triggers re-processing of all pages that reference that character
  • Full rebuild produces identical output to incremental rebuild (correctness invariant)
  • Measurable speedup on a 200-page project with single-file edits (target: >5x faster than full rebuild)

Approach

Change detection: Use file modification timestamps or content hashes to identify changed files between builds. Store the previous build's entity registry and per-page AST hashes.

Dependency graph: During Phase 4, track which registry queries each post-processing hook makes (entity types and names accessed). Store this as a dependency map: page → Set<entityType:entityName>. On next build, if any dependency changed, that page needs re-processing.

Cache storage: Store cached ASTs, entity registrations, and dependency maps in a .refrakt/cache/ directory (or in-memory for dev server). Include a cache version to invalidate on pipeline code changes.

Aggregation shortcut: If no entities changed between builds, skip Phase 3 entirely and reuse the previous aggregated data.

References

  • SPEC-002 (Cross-Page Pipeline — Performance Considerations, Incremental Builds)