WORK-162
Setting up your dashboard 0 entities found · 7/34 branches scanned
ID:WORK-162Status:draft

Refactor runPlugin dispatch to use discoverPlugins

Switch the CLI's plugin dispatch in packages/cli/src/bin.ts from blind import('@refrakt-md/<namespace>/cli-plugin') to a discoverPlugins() lookup. This produces a friendlier "did you mean?" error when a namespace is misspelled (since we know the full set of installed plugins) and centralizes plugin loading on the new helper.

Priority:highComplexity:moderateMilestone:v0.11.0Source:SPEC-043

Criteria completion

Criteria completion: 0 of 5 (0%) checked; tracking started on May 1, no incremental history yet0%25%50%75%100%May 1Jun 15

Tracking started May 1 — check back for trends.

Acceptance Criteria

  • runPlugin(namespace, args) in packages/cli/src/bin.ts calls discoverPlugins() once and looks up the namespace in the result
  • Unknown namespace produces an error message that lists installed namespaces and suggests the closest match (Levenshtein distance ≤ 2)
  • When no plugins are installed, the error message points the user at how to install one (e.g., npm install @refrakt-md/plan)
  • Existing behavior preserved: known namespace + unknown subcommand still lists available subcommands
  • Tests cover: known namespace + known subcommand, known namespace + unknown subcommand, unknown namespace with suggestion, unknown namespace with no plugins installed

Approach

  1. Replace the inline import block in runPlugin with a discoverPlugins() call.

  2. Add a small Levenshtein helper (or use a tiny dependency like fastest-levenshtein if already available in the workspace) for "did you mean?" suggestions.

  3. Cache the discoverPlugins() result for the lifetime of the CLI invocation — important because both dispatch and --help may call it.

Dependencies

  • WORK-160 — needs discoverPlugins() to exist
  • WORK-161 — uses the shared CliPluginCommand type

References

  • SPEC-043 — Refrakt MCP Server
  • packages/cli/src/bin.tsrunPlugin to refactor