WORK-334
ID:WORK-334Status:draft

Chart renderer provider selection and additional providers

Demand-driven follow-up to the WORK-333 seam: ship renderers beyond the built-in svg (e.g. a charting library) and the SSR capability, on the provider model resolved in SPEC-083.

Status: draft — demand-driven (not blocked). The provider model is settled (single rf-chart delegating to an app-registered ChartProvider; selection author → site-default → svg; theme orthogonal via tokens). This item only makes sense once there's a concrete need for a second renderer — building one speculatively is the YAGNI trap SPEC-083 warns against.

Priority:lowComplexity:unknownSource:SPEC-083

Criteria completion

Criteria completion: 0 of 6 (0%) checked; tracking started on Jun 3, no incremental history yet0%25%50%75%100%Jun 3Oct 12

Tracking started Jun 3 — check back for trends.

Scope (introduces the whole provider abstraction — none of it exists after WORK-333)

  • The ChartProvider contract + registry (registerChartProvider), and promoting WORK-333's standalone renderSvg(...) into the built-in svg provider behind it.
  • The provider modifier + data-provider and selection precedence (author attr → site/app default → built-in svg); rf-chart reads data-provider and delegates.
  • Additional renderers as per-provider optional packages (@refrakt-md/chartjs, @refrakt-md/d3), lazy-loaded via dynamic import only when selected. Decide the package shape when the first lands:
    • (A) plain provider package — exports a ChartProvider, app registers it at its client entry (lean: start here);
    • (B) provider as a refrakt Plugin — a new chartProviders contribution + client-registration wiring, added via refrakt.config.plugins[].
  • The optional SSR path: providers implementing renderToString, invoked at the framework-integration layer (where registerElements() runs) for a no-JS chart — starting with the deterministic built-in svg.

Acceptance Criteria (finalize when a concrete provider lands)

  • ChartProvider contract + registerChartProvider registry; built-in svg conforms; rf-chart delegates by data-provider.

  • At least one additional provider (real or stub) validates the registry + lazy-load path; shipped as its own package per shape (A)/(B).

  • Author per-chart override + site/app default both exercised end-to-end.

  • SSR renderToString proven on the built-in svg provider (if the no-JS posture decision lands that way).

  • Docs; full suite green.

  • Every provider added here honors the WORK-353 theming contract — it reads the --rf-chart-* custom properties (palette, geometry, typography/grid) and applies the sentiment colouring convention, so charts stay on-brand regardless of renderer.

Dependencies

  • WORK-333 — the single-provider seam this generalizes.
  • WORK-353 — the theming contract every provider must implement.

References

  • SPEC-083 — semantic chart data + pluggable renderer providers.