SPEC-080
Setting up your dashboard 0 entities found · 7/32 branches scanned
ID:SPEC-080Status:draft

Block-and-layout rune assembly model

Refine the SPEC-079 zone model into a smaller, orthogonal contract for how metadata-bearing and media-bearing runes are assembled. A rune transform emits a tree of named blocks; the theme projects metadata blocks from a field manifest and composes the final tree by placing block names into containers. Field shape (chip vs bare), block grouping, layout geometry, and final placement become four independent axes instead of the overlapping zones / zoneLayouts / contentSlots / order / zoneHost / zoneHostPlacement surface that has accreted on RuneConfig.

This supersedes the placement-related parts of SPEC-079 (zones shape, zoneHost, zoneHostPlacement, eyebrow left/right slots). The data-manifest idea (metaFields) and the plugin-declares-data / theme-declares-presentation split from SPEC-079 are kept and extended.

Terminology

"Eyebrow" was overloaded across a position, a geometry, and a rune. We split the word's three meanings so each axis is named for what it is:

  • eyebrow — a position only. The kicker slot above the heading, in the canonical order eyebrow → title → blurb → metadata → body. Positional, the traditional editorial meaning. It names no geometry and no rune.
  • bar — a geometry. A horizontal flex row of fields with wrap + per- field align. It is position-neutral (an eyebrow kicker, a metadata strip, a footer row are all bars). bar replaces both split and chip-row — which were the same geometry differing only in wrap/alignment, and where "chip-row" became a misnomer once field shape went intrinsic (a bare field stays bare). The other layout primitive is definition-list (labeled pairs).
  • bar — the rune. The eyebrow rune created on the SPEC-079 branch (unreleased) is renamed bar: a position-agnostic authoring handle for a two-aligned row. Where it lands is placement, not the rune's identity.

Problem

The SPEC-079 implementation shipped and works, but iterating on recipe, howto, faction, realm, and character surfaced four structural issues in RuneConfig.

1. Placement-concept proliferation. There are now ~6 fields that influence where a node lands or in what order:

  • order — sequence of canonical positions
  • zoneHost + zoneHostPlacement — nest projected zones into a container, before/after its leading header
  • projection.{hide,group,relocate} — post-hoc tree surgery by data-name
  • contentWrapper — wrap content children
  • sections — assign data-section roles
  • legacy slots + structure — the pre-SPEC-079 assembly model

zoneHost/zoneHostPlacement were added to nest the metadata def-list into a split rune's content column (recipe), then to flip it above the header. But zoneHostPlacement is just ordering re-expressed in a second coordinate system, and projection.relocate already overlaps zoneHost. When two fields can accomplish the same move, theme authors don't know which is canonical and we maintain both.

2. zoneHost exists because of "hybrid" runes. Recipe, faction, etc. hand-assemble content + media in their transform and only project the metadata zone. The engine owns one position and must thread it into a structure it didn't build, anchored to a <header> it locates heuristically. That bridge is fragile (find-the-header, before/after) and can't express "put the metadata over the image."

3. chip vs plain rendering is decided inconsistently. The MetaField doc says "the shape around the value (chip vs plain text) comes from the layout primitive," but two contradictory rules exist:

  • Legacy structure (what api still uses): metaType present → .rf-badge. So method/auth are chips and path (no metaType) is a bare <code>.
  • SPEC-079 layouts: chip-row makes everything a chip; split / definition-list make a chip only when sentimentMap is present.

The same field renders differently depending on layout (id is a chip in chip-row, plain in definition-list). api's correct look only survives because it is still on the legacy path.

4. Block definitions are not uniform. definition-list and chip-row take a flat fields: [], but eyebrow's split took { left: [], right: [] }. The structural left/right split bakes a presentation decision (which side a field hugs) into the data manifest.

Model

Two phases with clean ownership.

Phase 1 — transform emits a tree of named blocks (rune author)

The transform builds the rune's semantic structure as addressable blocks. Recipe already does this:

media
content
  preamble        (eyebrow + title + blurb, as authored)
  ingredients
  steps

Block data-names are the addressing API. Containers (e.g. content) hold an ordered child list. The transform knows nothing about metadata projection or theme placement.

Phase 2 — config projects metadata blocks and composes the tree (theme; plugin ships defaults)

Two sub-steps:

(a) Define metadata blocks from the field manifest, each with a layout.

(b) Compose the final tree by naming, per container, the ordered child blocks — transform-built or metadata-projected:

media
content
  metadata projected, placed here by the theme
  preamble
  ingredients
  steps
  tags projected (illustrative future block)

Because placement targets any container, a theme can put metadata into media to overlay it on the image — a capability zoneHost could not express.

Four orthogonal axes

The test of the design: these four concerns never overlap.

  1. Field shapeintrinsic to the field. Whether a value renders as a chip (.rf-badge) or bare inline text is a property of the field, not the layout. Driven by the metaType taxonomy (below). A field renders the same way in every layout.
  2. Blockgrouping + layout. A named block is a flat list of fields plus a layout primitive (and optional per-field align). Plugin ships defaults, theme overrides.
  3. Layoutgeometry only. definition-list (dt/dd grid) and bar (horizontal flex row; wrap + per-field align). bar replaces both split and chip-row. Layouts arrange fields; they never decide a field's shape.
  4. Placement / CSSposition. The layout map decides which container a block sits in and its order among siblings; final visual nudges (e.g. right-aligning a field) live in CSS.

Contract

// PLUGIN: pure data manifest. `metaType` now also implies render shape.
metaFields?: Record<string, {
  metaType?:
    // chip-rendered (.rf-badge)
    | 'status' | 'category' | 'tag'
    // bare-rendered (inline, data-meta-type drives typography)
    | 'id' | 'quantity' | 'temporal' | 'code';
  label?: string;
  sentimentMap?: Record<string, 'positive'|'negative'|'caution'|'neutral'>;
  condition?: string;
  tag?: string;
  splitOn?: string;
  transform?: 'duration' | 'uppercase' | 'capitalize';
  // ── Rich field renderings (a field is one source value → one rendering,
  //    which may be multi-node). Each is a small, opt-in rendering swap. ──
  // Link: the named modifier's value is the URL, the field's label (or
  // value) is the link text. Bare (no chip). Source/repo links etc.
  href?: string;
  // Icon decoration: prefixes the value with an icon from
  // `config.icons[group][value]` (engine renders the placeholder; lumina
  // draws it via mask-image keyed on the value). The icon is part of THIS
  // field — not a separate field. Covers hint type, etc.
  icon?: { group: string };
  // Rating: the value is a count; `total` names the modifier holding the
  // max (default 5). Renders `total` marks, `value` of them filled.
  rating?: { total?: string };
  // Render shape (chip vs bare) is derived from metaType — no per-field
  // override. If a real case ever needs one, revisit then.
}>;

// THEME-overridable: metadata fields grouped into named blocks + layout.
blocks?: Record<string, {
  fields: (string | { field: string; align?: 'start' | 'end' })[];
  layout: 'definition-list' | 'bar';
  /** `bar` only: wrap onto multiple lines (chip-row behaviour). Default true. */
  wrap?: boolean;
}>;

// THEME-overridable: the projected tree — ordered child block names per
// container. A key is a container's `data-name`, or the reserved key `root`
// for the rune's own top-level children (flat runes with no content/media
// wrapper place their blocks here). Projected (metadata) blocks appear ONLY
// where named — no canonical/default placement. Transform-built blocks the
// theme didn't name are appended in transform order (rune content is never
// dropped). Omitting `layout` renders the transform tree verbatim.
//   `root` is reserved; `data-name="root"` is not a valid block name.
layout?: Record<string /* 'root' | container data-name */, string[] /* block names */>;

metaFields, sections, mediaSlots, editHints, modifiers, styles keep their roles. zones, zoneLayouts, contentSlots, order, zoneHost, zoneHostPlacement, and the legacy slots / structure are removed once all runes migrate. The split and chip-row layout primitives collapse into bar, and the unreleased eyebrow rune is renamed bar (the word eyebrow survives only as a position name).

Field shape via metaType taxonomy

Reverses the SPEC-079 statement that shape comes from the layout. Shape is intrinsic to the field:

  • Chip-rendered (buildChip.rf-badge): status, category, tag.
  • Bare-rendered (buildPlainValue → inline, data-meta-type): id, quantity, temporal, and a new code type (monospace inline, e.g. an API path).
  • sentimentMap is orthogonal: it only adds colour to whichever shape the field already has.

Every layout iterates its fields and calls buildChip / buildPlainValue purely from the field — never from the layout. Consequence: the horizontal bar no longer forces every field into a chip; it "arranges fields (each in its own shape) in a row," which also removes the id-chip-vs-plain inconsistency. wrap: true (default) gives the old chip-row behaviour; wrap: false plus per-field align gives the old split/eyebrow bar.

Bar alignment (no left/right slots)

"Left/right" is alignment, and alignment is presentation. Project the bar as a flat field list; order + a per-field align: 'end' express the right-hand group; one shared rule does the work:

[data-zone-layout="bar"] [data-align="end"] { margin-left: auto; }

margin-left: auto in a flex row pushes the field and everything after it to the right edge — which covers the universal "left cluster / right cluster" bar. Three distinct alignment groups are an escape-hatch CSS job, not new config.

Case study — api (bar in the eyebrow position, mixed shapes)

api is visually a bar in the eyebrow position today ([method] [path] … [auth]) but is still on the legacy structure path. Target — note the block is named for its position (eyebrow) while its layout is the geometry (bar):

metaFields: {
  method: { metaType: 'category', sentimentMap: { GET:'positive', POST:'neutral', DELETE:'negative', /*…*/ } }, // chip
  path:   { metaType: 'code' },                                                                                  // bare <code>
  auth:   { metaType: 'status', condition: 'auth' },                                                             // chip
}
blocks: {
  eyebrow: { fields: ['method', 'path', { field: 'auth', align: 'end' }], layout: 'bar', wrap: false },
}
layout: { content: ['eyebrow', 'body'] }

method/auth are chips and path is bare because of their types, in any layout — no layout-specific or slot-specific logic. api is the recommended first prototype: tiny, no media/split complexity, already visually an eyebrow.

Case study — recipe (the hardest: split media + content)

media
content
  metadata         (def-list; theme places it above preamble)
  preamble
  ingredients
  steps

blocks: { metadata: { fields: ['prepTime','cookTime','servings','difficulty'], layout: 'definition-list' } } and layout: { content: ['metadata','preamble','ingredients','steps'] }. "Above vs below the header" is just the block's position in the content list — no zoneHostPlacement. Faction/realm use the same with metadata after preamble; character keeps a floated portrait and places metadata after the title.

Case study — a flat rune (no content/media containers)

Many runes have no content/media wrapper — their blocks sit directly under the rune root. The reserved root key addresses that top level:

<article data-rune="work"> the rune root
  eyebrow                        (bar: id + status)
  title
  metadata                       (projected here)
  body

layout: { root: ['eyebrow', 'title', 'metadata', 'body'] }. No wrapper element is introduced; the projected metadata block is placed among the root's own children, and unnamed transform blocks append as usual. A rune may mix both — { root: [...], content: [...] } — when it has a container and top-level blocks.

Acceptance Criteria

  • RuneConfig exposes blocks and layout; zones, zoneLayouts, contentSlots, order, zoneHost, zoneHostPlacement are removed.
  • Field shape (chip vs bare) is decided from the field's metaType, identically across definition-list and bar. No per-field override.
  • Every block in the rendered tree is placed by an explicit layout entry; there is no implicit/default placement, even for simple runes.
  • A code metaType renders monospace inline with no chip geometry.
  • bar is the single horizontal layout (split and chip-row removed), with a wrap knob and per-field align; right-alignment is align: 'end' driving one shared [data-zone-layout="bar"] [data-align="end"] { margin-left: auto } rule (no left/right wrappers).
  • The unreleased eyebrow rune is renamed bar; eyebrow remains only a position name in the canonical order.
  • layout placement is sparse: unnamed transform blocks append in transform order; metadata blocks appear only when named; a block name absent from the tree is skipped.
  • layout addresses both nested containers (by data-name) and the rune's top-level children (the reserved root key), so flat runes — with no content/media container — place projected blocks via root.
  • A theme can place a metadata block into the media container (overlay).
  • api, recipe, howto, faction, realm, character render equivalently to today (modulo intended changes) through the new model.
  • Block names are surfaced in the generated structure contracts as the stable addressing API.

Migration

  • Split/media runes (recipe, howto, faction, realm, character) already build a named-block tree; they migrate by moving zones+zoneLayoutsblocks and zoneHost(+placement)/orderlayout.
  • The plan family (work, spec, bug, decision, milestone) leans on the dispatcher + contentSlots + canonical order; converging them means their transforms build their own block tree. This is the bulk of the work.
  • Ship behind the new fields with the legacy slots/structure and SPEC-079 paths intact; remove them once every rune is migrated.
  • api first as the isolated proof of the bar layout + intrinsic-shape mechanism.

Resolved decisions

  • Eyebrow vs bar. eyebrow is a position only. The horizontal geometry is bar (one primitive; wrap + per-field align), absorbing both split and chip-row. The unreleased eyebrow rune is renamed bar. (See Terminology.)

  • Vocabulary: block. The addressable node in a rune's tree is a block. region (page layout) and zone (SPEC-079) are not reused for this.

  • No per-field shape override. Render shape is derived from metaType alone (chip types vs bare types). No as field ships now; revisit only if a real case demands a shape that contradicts the semantic type.

  • Explicit placement, no magic defaults. There is no canonical/default placement (e.g. "metadata after preamble"). Every projected block appears only where an explicit layout entry names it — including simple runes. A rune with no layout renders its transform tree verbatim (projected blocks don't appear). Within a container layout addresses, transform-built blocks the theme didn't name are appended in transform order, so the rune's own content is never silently dropped.

  • projection stays. projection (hide/group/relocate) is retained as the deep-surgery escape hatch alongside postTransform; it is not subsumed into layout, which is deliberately shallow (ordered block names per container). Revisit if layout ever proves it can absorb the real cases.

  • A field is one source → one rendering; no fan-out / fan-in. Rich renderings (href, icon, rating, splitOn) let a single field render to multiple DOM nodes, and decorations (sentiment, icon) enrich it — but the model deliberately has no "one value → multiple separate fields" (fan-out) or "multiple values → one element" (fan-in) primitive. The two genuinely-different needs go where they already belong: composing several values into one is transform data-shaping (derive a single modifier); placing one value in two spots is just two fields reading the same modifier. This keeps fields as the single projection unit and avoids two symmetric config mechanisms.

  • structure is fully replaceable. Its uses decompose into: metadata → blocks; data-driven chrome (icon/label/rating) → rich field renderings; pure decoration (e.g. codegroup window-dots) → CSS. So WORK-320 can remove the structure path entirely (no repeat/injection mechanism survives).

Open Questions

None outstanding — see Resolved decisions.