SPEC-130
ID:SPEC-130Status:shipped

Declarative schema.org mapping

Move the schema.org channel from 35 imperative call sites across 30 runes into declarative data, keyed by the rune's own names — the same shape BEM, modifiers and editHints already use.

Declared on the rune, not in theme config. Schema.org output is what a rune means, and ADR-028 settles that such facts are rune identity: a theme may not redefine them. So the table sits beside the rune's other self-declarations and is referenced from config, exactly as sections is.

Implemented by 14
Related 36
// plugins/media/src/tags/playlist.ts — beside playlistSections, playlistMediaSlots
export const playlistSchema = {
  by: 'type',
  album:   { type: 'MusicAlbum',    properties: { track: 'track' },   children: { track: 'MusicRecording' } },
  podcast: { type: 'PodcastSeries', properties: { track: 'hasPart' }, children: { track: 'PodcastEpisode' } },
} as const;

Problem

A rune's structured data is written by hand inside its transform:

createComponentRenderable({ rune: 'accordion', schemaOrgType: 'FAQPage',
  schema: { mainEntity: items },
  …
});

Four consequences:

It is larger than the schema: surface suggests. The 22 schema: maps are the part that already looks like data. The rest of the channel is written straight into the tree:

FormSitesExample
schemaOrgType: on createComponentRenderable35every emitter
schema: property maps22recipe, event, track
typeof: on a hand-built Tag7testimonial's Person, event's Place
property: on a hand-built Tag16playlist's byArtist spans
node.attributes.typeof = … / .property = … mutation8recipe's <li>s, accordion's Answer

So roughly a third of the channel is invisible to a survey of schema:, and all of it is the interesting third: it is where nested entities, per-item types and computed positions are produced. A table that only replaces schema: would leave the hard half imperative and the rune half-declarative — the "not half of each" failure this spec's own acceptance criteria rule out.

It cannot be overridden. An accordion is a FAQPage on every site, in every context, forever. Rendering a list of universal attributes as accordion items (WORK-548) therefore publishes roughly 970 fabricated Question entries across 88 pages — plausible-looking structured data asserting something untrue.

It cannot be changed coherently even in principle, because the type appears at two levels. accordion declares FAQPage with mainEntity; each accordion-item independently declares Question with name / acceptedAnswer. Switching to ItemList means renaming the parent's property and changing the child's type and both of its properties. An attribute on the parent cannot reach the child's transform, so the change is not expressible without the rune carrying a per-type table — which is what this spec proposes making it.

It is invisible to tooling. refrakt contracts claims to describe the complete output of the identity transform and says nothing about schema.org; refrakt reference likewise. Nobody can answer "what structured data does this page emit?" without reading transforms.

Constraint: this cannot live in the engine

The obvious home is the identity transform engine, which already walks the tree reading config. It does not work, and the reason is worth stating plainly because it is not obvious from the architecture diagram.

packages/content/src/site.ts never applies the identity transform. It runs Markdoc.transform and then, at line 393, extractSeo — and collectJsonLd derives the JSON-LD by walking that tree for typeof attributes. The engine runs later, at render time. So schema emitted by the engine would reach the HTML and never reach the JSON-LD.

extractSeo is in fact earlier than "before the engine": it runs inside the per-page loop, before runPipeline at line 453, and page.seo is never recomputed from the enriched pages. So the harvest point precedes the whole cross-page pipeline too.

The mapping is therefore data consulted at transform time, not engine behaviour. createContentModelSchema is the place that sees every rune's own transform — it wraps each one and already post-processes the result (the tint and bg meta injection). 34 of the 35 emitters go through it, so schema application is one step there rather than 35 edits.

The one emitter it does not see

buildAutoBreadcrumb (packages/runes/src/config.ts) constructs breadcrumb and breadcrumb-item renderables from a postProcess pipeline hook, not from a Markdoc schema. Two things follow, and the second is a live defect rather than a design question:

  • A wrapper-based mechanism cannot reach it. Either the hook calls the same applier directly, or breadcrumb auto keeps a hand-written mapping and the "not half of each" criterion is already violated on day one.
  • Its structured data never reaches the JSON-LD at all today. postProcess is phase 4; extractSeo ran in phase 1. {% breadcrumb auto=true %} renders a correct BreadcrumbList in the HTML and contributes nothing to page.seo.jsonLd. Nothing tests this — no pipeline test asserts on seo.

The same blind spot covers every other sentinel resolved in postProcess (collection, pagination, aggregate, drawer) should any of them ever carry schema.

That reframes the rejected alternative below. "Relocate extractSeo" is not merely a larger change with no upside; it is the only option that closes the postProcess hole — and, as the hidden-carrier section shows, the only one that lets the rendered node carry the schema. Keeping the harvest where it is means this spec ships a mechanism with a known gap, which is defensible but must be said out loud — see the harvest decision, and the two-point invariant that makes the move testable.

Selection and application split

An earlier draft of this section was called "Nothing needs threading" and claimed the table could live wholly in createContentModelSchema, with createComponentRenderable untouched. That is wrong, and the reason decides the shape of the mechanism.

createComponentRenderable classifies each property <meta> by consulting schema: at build time:

const isSeoMeta = n.name === 'meta' && schemaTags.has(n);
if (!isSeoMeta) n.attributes['data-field'] = toKebabCase(k);
…
if (!isSeoMeta) pureDataMetas.add(n);
…
.filter(c => !emptySeoMetas.has(c) && !pureDataMetas.has(c))

A property meta that is not named in schema: gets data-field and is dropped from the children. The ones that survive do so precisely because the rune declares them — visible in today's output:

<meta content="Pink Floyd" property="byArtist" />   <!-- playlist -->
<meta content="PT15M" property="prepTime" />        <!-- recipe -->

So if the call sites "stop passing schema entirely" and the table is applied afterwards in the wrapper, those nodes no longer exist by the time the applier runs. There is nothing left to stamp.

This is not a corner case. It hits every schema value that is a <meta> also listed in properties — at least 8 runes and ~16 properties: recipe (3), event (3), track (5), playlist, character, realm, lore, howto. That is almost exactly the "computed metas — declarative by reference" row of the survey, the half this spec called easy. The reference only holds while the rune declares it at build time. (embed escapes because its schema metas are not in properties; non-meta nodes escape because only metas are dropped.)

The fix is the field bag, and it is simpler than it looked. A prototype (below) settled this. data-rune-fields already carries every scalar property value, typed, on the rune root — which is exactly what a value-only schema property needs. The applier does not need the dropped <meta> to survive; it rebuilds a carrier from the bag:

const node = findByName(root, src);
if (node) { node.attributes.property = prop; return; }   // visible carrier: stamp in place
const v = bag[src];                                       // value-only: rebuild
if (v !== undefined) root.children.push(new Tag('meta', { property: prop, content: String(v) }));

So createComponentRenderable needs no knowledge of schema at all — it simply always treats property metas as pure data, which is already what it does when schema: is absent. Selection needs attrs and application needs the tree plus the bag; the wrapper has all three. Nothing is threaded into createComponentRenderable after all.

An earlier revision of this section proposed threading the resolved row down one level, on the assumption that a dropped node was unrecoverable. It is not — the bag is the recovery. Recorded because the reasoning ("the meta is gone, therefore the applier must run where the meta still exists") is plausible and wrong, and someone will re-derive it.

So the table is still an option to createContentModelSchema, sitting with the rune-identity declarations already there — sections, mediaSlots, provides, base — and the resolved row is threaded one level down:

export const playlist = createContentModelSchema({
  sections: playlistSections,
  mediaSlots: playlistMediaSlots,
  schema: playlistSchema,        // ← beside its siblings
  attributes: { … },
  transform(resolved, attrs, config) { … },
});

Since ADR-028 rules out merging, there is no merged view to assemble and no config.variables threading is required — the table is a module constant in lexical scope, and contracts / reference read it the way they already read sections. The threading is one resolved row, passed one level, not a table plumbed through the pipeline.

The 35 call sites still get simpler: they stop hand-writing schemaOrgType and the schema map, and carry a single opaque value they do not construct.

The child mapping works because Markdoc transforms bottom-up. By the time the wrapper sees result, the children carry their own typeof, so it rewrites them — the move stripSchemaOrg already makes for schema="none" (WORK-552).

Relocating extractSeo is the alternative, and it is really two alternatives that must not be conflated: moving it after the pipeline and moving it after the engine differ by an order of magnitude. Decided below: the first is in scope, the second is ruled out.

Ownership: the rune, not the theme

An earlier draft of this spec put the table in ThemeConfig.runes alongside block and structure, and listed "a site can restate a rune's schema without forking it" as a benefit. That is an anti-feature, and ADR-028 had already decided against it:

Attribute applicability is a property of the rune, never of the theme.

Content becomes portable in fact, not just in principle. Today the same markdown can mean different things under different themes.

Emission stays theme-agnostic, and no mechanism will be added for a theme to suppress it.

Schema.org is the sharpest case that reasoning covers. It is a machine-readable public claim about what the content is; a theme able to change it would mean the same markdown says different things to a search engine depending on how the site is skinned. Styling is the theme's business — emission is not.

So schema follows the pattern already established for sections:

// SPEC-125 Phase 2 — join tables the rune declares about itself. Referenced
// from the theme config rather than owned by it: a theme may not redefine
// what a section *is* (ADR-028).
export const accordionSections = { … } as const;

Declared on the rune, referenced from config so tooling can read it, and added to IDENTITY_FIELDS in packages/transform/src/identity-fields.ts so no merge path can redefine it.

The legitimate per-site need is already served, at the right layer. An author who wants different structured data says so in content — by the attribute the rune already derives from, or schema="none" — where they are making a claim about their own content. A theme making that claim on their behalf, for every page, is the thing being ruled out.

Key direction: the rune's name, not the schema property

The table is keyed by a name in the rune's own flat namespace and valued by the schema.org property:

properties: { 'author-name': 'name', 'author-role': 'jobTitle' }

"Flat namespace" is ADR-008's term and is the precise one here: properties and refs share a single namespace with uniqueness enforced, so a key names exactly one node. Which HTML attribute that name surfaces as — data-name for a refs entry, data-field for a properties entry — is a consequence of which map the rune put it in, not a second key space. The applier resolves both, e.g. playlist's track items are addressed as track and carry data-field="track".

That asymmetry is worth a glance but not a fix here: the track <li>s are structural children parked in properties (the "content-marker property" idiom createComponentRenderable documents, shared with budget's category, accordion's item, itinerary's day), so they get data-field and no BEM element class, while their container — a refs entry — gets both. Moving those to refs would be a genuine cleanup and would give the items the .rf-playlist__track class they arguably want, but it changes HTML output across several runes for reasons unrelated to schema.org. Out of scope here.

This is deliberate, and it is the opposite of the imperative schema: map it replaces (schema: { reviewBody: quoteTag } — schema property as key). The flip is worth stating because anyone who has read the 22 existing maps will read the new form as backwards.

It goes this way because every declarative join table in the codebase does:

TableKeyValue
sectionsheadlinetitle
mediaSlotsmediacover
editHintsheadlineinline
autoLabelsummarysummary
contextModifiersparent-runesuffix

All keyed by what the rune has, valued by what it means — which is what SPEC-125 means by "join tables the rune declares about itself". The imperative schema: map is the odd one out, and it is the one going away.

One invariant reinforces it: ADR-008 gives properties and refs a single flat namespace with uniqueness enforced (createComponentRenderable throws on a collision), so these keys are guaranteed unique. Schema property names carry no such guarantee, and keying by them would forbid two sources mapping to one property — recipeIngredient drawn from two places, say. Neither multiplicity is needed today, but only one direction has the uniqueness already enforced.

The cost is real and is accepted: curating a table ("is PodcastEpisode right for PodcastSeries?") means scanning schema.org names, which now sit in the value column. The mitigation is that inspect and reference render the resolved table, and can order it by schema property regardless of how it was authored — the review view need not match the authoring view.

What the table has to express

Surveyed across all 30 emitting runes — not just the 22 schema: maps — they fall into three groups, and only the middle one matches the design as sketched above.

Group A — a type and nothing else (7 runes)

gallery, data-table, budget, itinerary, map, symbol, blog declare a schemaOrgType and no schema: map at all. What reaches the page is an empty entity:

{ "@context": "https://schema.org", "@type": "Dataset" }
{ "@context": "https://schema.org", "@type": "ItemList" }

Checked by running extractSeo directly over gallery, data-table, budget, itinerary and map; symbol and blog carry no schema: map either, so nothing stamps a property inside them. These assert a type and describe nothing — a Dataset with no name, description or distribution; an ItemList with no itemListElement. They are not wrong the way a podcast typed as a music playlist is wrong, but they are pure noise in every consumer.

The table forces the question the imperative form let us skip: should an entity with no properties be emitted at all? Proposed rule — no. A row that resolves to a bare @type emits nothing, and a rune that wants an entity declares at least one property. That deletes seven meaningless entities across the catalog for free, and gives Group A a migration that is "write the mapping or lose the type", which is the right forcing function.

Group B — a flat map of named refs (14 runes)

figure, embed, cast-member, character, realm, faction, plot, lore, organization, pricing, tier, timeline-entry, track, breadcrumb-item. These are the clean case the original survey describes: the values are either named refs (nameTag, titleTag, tiers) or computed metas (parsedPriceMeta, estimatedTimeMeta) that already carry data-name / data-field. The transform computes values, the table names their schema roles, and nothing has to be computed by the table.

Group C — imperative construction (9 runes)

accordion, accordion-item, breadcrumb, event, how-to, playlist, recipe, testimonial, timeline. Here the schema is not a map over existing nodes; the transform builds schema-bearing structure. Four distinct shapes, none of which the table as first sketched expresses — though, as the next section shows, what each one actually needs differs enormously:

ShapeWhereWhat it does
Retype + wrapaccordion-item, recipe, how-tosets typeof on a node it did not create and wraps its children in a <div property="text"> / <p property="text"> to supply the value
Synthesise an entitytestimonial, eventbuilds a Person / Rating / Place span from text pulled out of other tags (authorNameTag.children.filter(…)) or from an attribute (attrs.location)
Index-derived valuesbreadcrumb, timelinethe parent emits each child's position from the loop index — a value that exists nowhere in the content
Inline property stampsplaylistwrites property: 'byArtist', property: 'duration' directly onto the spans it builds for each track

What Group C actually costs

The obvious reading is "these nodes are unaddressable, so give everything a data-name first". That is the wrong diagnosis, and acting on it would be mostly wasted work. Taken shape by shape:

Inline property stamps — nothing missing. playlist's track spans already carry data-name="track-name" / "track-artist" / "track-duration", set on the same line that stamps the RDFa. They are addressable today; they are simply not keyed declaratively. Pure lookup once the table exists.

Retype + wrap — a data-name adds nothing, and the wrapper has to stay. recipe's <li>s already get data-name = 'ingredient' / 'step' on the line above the mutation, so addressing is not the obstacle. The wrapper is — and the tempting move is to delete it by teaching collectJsonLd to take a typed node's own text as a named property:

// seo.ts — collectProperties
if (prop && !childTypeof) { /* extract value */ }

That would break the HTML. The rule mirrors RDFa rather than deviating from it. RDFa Core 1.1 §7.5 step 11 resolves a property's object as: @content → literal; else @typeof present and @about absent → the typed resource; else a plain literal from the text. So an element carrying both property and typeof has its object fixed to the typed resource, and its text is unreachable as a literal. Today's output —

<div typeof="Answer" property="acceptedAnswer"><div property="text">…</div></div>

— expresses _:q acceptedAnswer _:a . _:a a Answer . _:a text "…". Without the inner element it expresses the first two triples and says nothing about the text. Since SPEC-082 chose to render the SEO carriers inline ("Option B" — component.ts:108), refrakt publishes the RDFa and the JSON-LD on the same page, so the two would assert different graphs on every accordion, recipe and how-to.

The wrapper is therefore the conformant idiom, not a workaround. What is wrong is that runes hand-write it. Move the wrapping into the applier and let the table declare only the role:

accordionItem: {
  type: 'Question',
  properties: { name: 'name' },
  entities: {
    body: { type: 'Answer', property: 'acceptedAnswer', text: 'text' },
  },
}

text: names the property that takes the node's own content; the applier emits the conformant wrapper, the way the engine's structure entries already own injected elements. That keeps the table a lookup, keeps the HTML valid, and collapses into the entities: form below rather than being a fifth concept — an Answer is a nested entity built from the body node.

Note the collector is otherwise a fair RDFa subset: property + href on an <a>, property + src on an <img>, and <meta property content> all resolve as RDFa 1.1 specifies. The one rule worth changing was the one holding conformance up.

The other three shapes are already conformant, checked against refrakt inspect output so the question does not get re-opened:

<li typeof="MusicRecording" data-field="track" property="track">  <!-- typed resource held by a property -->
<span typeof="Person" property="author"><meta property="name" …>  <!-- same, with inner literals -->
<meta content="1" property="position" />                          <!-- plain literal -->

So wrapping was the only place where the imperative form was load-bearing for the standard rather than merely habitual. The rest of Group C is imperative by accretion, and can be moved into the table without touching what the HTML asserts.

Index-derived values — one keyword. position: 'index'. A value that is not in the content has to be generated, and no amount of naming helps. The vocabulary is closed: index is the only generator anywhere in the codebase, used by two runes.

Synthesised entities — one new entry kind, and still not about naming. Naming the invented <span typeof="Person"> is pointless, because under a declarative table the applier is what creates it. What matters is whether the sources are addressable, and they already are — testimonial has author-name / author-role refs and a rating property; event has location as a data-field before the Place span duplicates the value. So the gap is a third kind of entry — group these named nodes into a nested entity:

entities: {
  author: { type: 'Person', property: 'author',
            properties: { 'author-name': 'name', 'author-role': 'jobTitle' } },
  rating: { type: 'Rating', property: 'reviewRating',
            properties: { rating: 'ratingValue' } },
}

This is an extension rather than a new concept: properties and refs already project over the same nodes twice (tier's nameTag is in both). entities is a third projection.

Total: one new entry kind (entities, carrying an optional text), one keyword (index), no change to collectJsonLd, and no new data-names for these runes — though the prototype later found a separate set that does need naming, cutting across all three groups. Group C is not the hard half of this spec; it is four small, separable decisions, and only one of them touches the table's shape.

Constraint: styling already selects on this channel

Surfaced while checking whether the property="text" wrappers were safe to delete. Lumina selects on RDFa attributes in six places:

SelectorStateWhy
.rf-tier h1[property="name"]livenameTag is in both refs and schema
.rf-plot > span[property="name"]livetitleTag is in both
.rf-tier p[property="price"]deadproperty="price" lands on parsedPriceMeta, a <meta> — not on the <p>
.rf-lore > span[property="title"]deadthe span carries property="headline"
.rf-bond > span[property="from"]deadbond has no schema: map at all
.rf-bond > span[property="to"]deadas above

Confirmed against refrakt inspect output for each rune, and none of the four dead rules has a BEM equivalent elsewhere in its stylesheet — so a lore title, a bond endpoint and a tier price render unstyled today. The CSS coverage test does not catch it: it checks that config-derived selectors exist, not that hand-written ones match.

Two consequences this spec has to absorb:

  • schema="none" is a styling hazard. stripSchemaOrg deletes property wholesale, so on pricing it would unstyle the tier heading. It is benign on accordion by luck rather than design, and WORK-552 has already shipped.
  • Any rename in the table silently restyles a rune. Every live selector is a tripwire across the migration, and the four dead ones are what that tripwire looks like after it fires — nobody noticed either time.

So the rule this spec should establish: presentation never selects on the schema.org channel. The refs already produce BEM element classes for every one of these nodes (.rf-tier__name, .rf-lore__title), which is what the CSS should have used. Migrating the six rules is small and half of it is a bug fix regardless of whether this spec ships — filed as BUG-015. Guarding it afterwards is a one-line assertion in the CSS coverage test.

This also sharpens the ADR-028 argument. The reason a theme may not redefine schema.org is that emission is a claim about content, not about skin. A theme that styles off emission has the same coupling pointed the other way: it makes the rune's appearance depend on its SEO channel, so a correction to the structured data becomes a visual regression.

Adjacent cleanup, moved out: property: 'contentSection'

An earlier revision of this spec scoped in the removal of property: 'contentSection' — 29 transforms passing a value that becomes data-field="content-section" and that nothing reads. It rode the same call-site sweep, so folding it in looked free.

It has moved to SPEC-133. The reason is that it is not the schema.org channel: createComponentRenderable maps the property field to data-field, not to the RDFa property attribute, and the thing it is an instance of is the six-way overload of data-field that SPEC-133 exists to resolve. Two different things called property in one call is a naming problem, not an emission one.

What stays here is only the consequence for this spec: the applier addresses nodes by a name in the rune's flat namespace, so whichever way SPEC-133 settles properties versus refs, the table keys do not change — see "Key direction" above.

The driving case: playlist

accordion alone would have produced a weaker design. playlist is the rune that shows what the table actually has to express, because it already declares what its content is and emits the wrong schema anyway:

type: { matches: ['album', 'podcast', 'audiobook', 'series', 'mix'] }  // line 28
…
schemaOrgType: 'MusicPlaylist'                                          // line 237, unconditional
schema: { name, image, byArtist, track: trackItems }
const trackAttrs = { typeof: 'MusicRecording' };                        // line 153, unconditional

So {% playlist type="podcast" %} publishes a podcast as a music playlist whose episodes are music recordings. Silently, on every podcast. Filed separately as BUG-013, since it is wrong today whenever this spec lands.

The correct mapping needs both kinds of change at once:

typeschema.orgItemsTrack propertyRelation to MusicPlaylist
albumMusicAlbumMusicRecordingtracksubtype — safe narrowing
mixMusicPlaylistMusicRecordingtracktoday's emitted type, for every row
podcastPodcastSeriesPodcastEpisodehasPartbranch switch
audiobookAudiobookChapterhasPartbranch switch
seriesCreativeWorkSeriesCreativeWorkhasPartbranch switch

Note that even the default is imprecise: album is a MusicAlbum, a subtype of MusicPlaylist, so the safe narrowing is already available and unused. The attribute's own default is album (attrs.type ?? 'album', line 98), not mix — so a table keyed on type needs an explicit fallback row for the absent case, and by: has to say whether it reads the attribute's default or requires the row named by the modifier's own default.

Consequence: schema keys off a modifier, not a new attribute

type and a schema attribute would be the same fact stated twice, and an author who disagreed with themselves would get no warning. So the mapping keys off the modifier the rune already has:

Playlist: {
  schema: {
    by: 'type',
    album:   { type: 'MusicAlbum',    properties: { track: 'track' },   children: { track: 'MusicRecording' } },
    podcast: { type: 'PodcastSeries', properties: { track: 'hasPart' }, children: { track: 'PodcastEpisode' } },
    …
  },
}

by names an existing entry in the rune's modifiers — itself an identity field under ADR-028 — so this reuses the mechanism that already drives BEM modifiers and data attributes rather than inventing a parallel one.

One wrinkle to settle: modifiers live in config, and the row is picked in the wrapper from attrs. modifiers: { type: { source: 'meta', default } } is read by the engine, which has no part in this path. So by: 'type' is in practice "the attribute named type", and the claim that it reuses the modifier mechanism is presentational unless something validates that the key really is a declared modifier. Either validate it (cheap — both declarations are in scope at build time) or say plainly that by names an attribute.

The child mapping has to remap properties, not just the type

children: { track: 'PodcastEpisode' } changes the item's @type and nothing else. But the item's properties are stamped inline, and they are MusicRecording properties. Today's actual output for type="podcast":

{ "@type": "MusicPlaylist", "name": "The Sunday Show", "byArtist": "Acme",
  "track": [ { "@type": "MusicRecording", "name": "Episode One",
               "byArtist": "Acme", "duration": "PT1800S" } ] }

Retyping the item to PodcastEpisode leaves byArtist on it — a property PodcastEpisode does not have. Worse than MusicRecording, which at least was coherently wrong. So a child row is a type plus a property map, the same shape as a parent row, and the design should show it that way:

podcast: {
  type: 'PodcastSeries',
  properties: { track: 'hasPart' },
  children: {
    track: {
      type: 'PodcastEpisode',
      properties: { 'track-name': 'name', 'track-duration': 'duration' },
      // `track-artist` is dropped: PodcastSeries carries the publisher, not the item
    },
  },
}

Which also means those inline spans must be reachable by name. They already carry data-name="track-name" / "track-artist" / "track-duration" — so playlist is addressable today, and it is the Group C rune that needs the least prep. That is a point in favour of it as the driving case.

That settles the layering:

  • derive — a content attribute picks the schema, because the author has already said what the thing is
  • suppress — schema="none", orthogonal (WORK-552)
  • override — schema="<Type>" was the third layer in an earlier draft. Deferred: with every multi-type rune carrying a table, it has no demonstrated use, and dropping it is what lets D5 dispense with validation. See D3.

Two emitters, one mapping

MusicRecording is stamped in two places: playlist's own <li> items (line 153) and the standalone track rune. Whether a per-type child mapping has to reach both was left open here as a design question this spec "must answer, not gloss".

Answered in D9 below, and the premise was wrong. The two emitters never populate the same collection: playlist builds its items exclusively from markdown-list itemModel data, and a {% track %} inside a {% playlist %} is not one of its tracks at all (BUG-016). So there is no shared mapping to keep in step, contextProperties is not required, and the per-type child-mapping criterion stands as written.

A related structural fact the table compiles down to: collectJsonLd nests a child entity only when the same node carries both typeof and property. Anything else typed floats up as a detached top-level entity — a {% figure %} inside an {% accordion %} currently emits a sibling ImageObject related to nothing. So "declare the child's type" and "declare the property that holds it" are one operation, and the table must not let a rune do the first without the second.

Curation, not validation

These mappings are hand-written per rune. Nothing checks that PodcastEpisode is really the right item type for PodcastSeries — refrakt ships no schema.org ontology and this spec does not propose adding one. At five rows per rune that is the right trade, but it means the table is a human judgement recorded in config, and should be reviewed as such.

What it unlocks

A safe type override. The per-type table makes schema="ItemList" express the parent rename and the child's type change together — the thing that is not expressible today.

Contextual schema. A child rune could declare what it means inside a given parent, mirroring the existing contextModifiers: { 'parent-rune': 'suffix' }:

Accordion: { schema: { …, contextProperties: { recipe: 'recipeInstructions' } } }

Worth noting this case is already expressible imperatively — a parent can map a child's tags into its own schema map with a cursor. What config adds is letting the child declare it, so the parent needs no knowledge of every rune that might appear inside it.

Deferred by D9, which found the case that motivated it (playlist / track) does not need it and could not use it: at transform time a child cannot see its parent, and a parent that wants a child in its graph must stamp property on it anyway. Kept here as a possible future, not a requirement of this spec.

Tooling. contracts and reference can describe the structured data, which closes a real gap in what contracts claims to cover. Both read config, so the table has to be reachable from config — which it is, by the sections pattern.

refrakt inspect belongs on that list too, and is the one that matters most in practice: it is the per-rune tool an author actually reaches for, and every claim in this spec was verified with it. Today it shows the RDFa only incidentally, as raw HTML in the rendered output. It should show the resolved schema row — the type, the property mapping, the child mappings — the way it already shows BEM classes and data attributes, and --audit should be able to report a rune whose table names a data-name the rune does not emit.

One declaration instead of two. defineRune({ schemaOrgType }) already carries a rune's type in the catalog — packages/runes/src/index.ts, nine entries. Nothing reads Rune.schemaOrgType: it is assigned in rune.ts:59 and never consumed, by reference, contracts, the language server or anything else. It has also drifted — nine entries for thirty emitting runes, and Accordion: 'FAQPage' is no longer unconditional since WORK-552. The table should replace it and the field should be deleted, or the second stale declaration outlives the first.

Prototype: the entities: shape, measured

entities: carries the whole of shape 2 and had only been sketched, so it was built throwaway against two runes — testimonial (sources are visible nodes) and event (a source that exists only as an attribute value). Both were rewritten to drop schemaOrgType, the schema: map and the hand-built entity spans, declaring instead:

export const testimonialSchema = {
  type: 'Review',
  properties: { quote: 'reviewBody' },
  entities: {
    author: { type: 'Person', property: 'author',
              properties: { 'author-name': 'name', 'author-role': 'jobTitle' } },
    rating: { type: 'Rating', property: 'reviewRating',
              properties: { rating: 'ratingValue' } },
  },
} as const;

Both reproduced today's JSON-LD. testimonial byte-identical (including its existing jobTitle: ", CTO at Acme" comma defect — the prototype was checked for equivalence, not improvement); event identical under the normalised comparison, differing only in key order because rebuilt carriers are appended last. The applier is about 60 lines and needs three resolution strategies: stamp a named node in place, rebuild a value-only carrier from the bag, or synthesise an entity span from either.

testimonial's rating is the case that mattered: its meta is dropped by createComponentRenderable once the rune stops declaring schema:, and the applier recovered the value from the bag. That is what settled the section above.

What the prototype found: unaddressable sources

A schema source that is in neither properties nor refs is reachable by neither route — not in the bag, and carrying no data-name. Two kinds recur:

KindRunesSources
Metas built only for SEOembed, tiertitleMeta, urlMeta, embedUrlMeta; parsedPriceMeta, resolvedCurrencyMeta
Image nodesfigure, recipe, playlist, realm, factionimgs[0], seoImage, sceneImgTag — the node itself is anonymous; only its wrapper is named

Roughly ten sources across seven runes. Each needs either a refs entry (giving it a data-name) or a properties entry (putting it in the bag) before the table can address it — small and mechanical, but it must happen before those runes migrate.

This also corrects an earlier claim in this spec that Group C needed "zero new data-names". That holds for the runes Group C named; it does not hold for this set, which cuts across all three groups and was invisible until the mechanism was built.

What the prototype did not cover

by: row selection from attrs, per-type children: mappings, and the text: carrier form are all still sketches. playlist exercises all three at once and is the natural second prototype if one is wanted.

Harvest at both points, and assert they agree

The spec has been treating the harvest point as a decision — keep extractSeo where it is, or move it. It is better as an invariant: harvest at both points and require the two graphs to match. Drift then fails a test instead of shipping.

It holds today. Measured by running collectJsonLd over the pre-engine tree and over the same tree after createTransform, across 15 runes spanning core and five plugins:

ResultRunes
Identicalaccordion, breadcrumb, figure, embed, gallery, budget, track, testimonial, pricing, timeline, cast
Key order onlyrecipe, howto, playlist, event
Semantic driftnone

So the engine is schema-preserving, and the test goes green on day one. It is a regression net, not a migration.

The comparison has to sort object keys and preserve array order. The four order-only cases are the runes whose metas the engine relocates to the end of the block, so collectProperties meets them later — a difference with no meaning in JSON-LD. Array order is the opposite: itemListElement, step, track and recipeInstructions are ordered sequences, and a breadcrumb whose items reversed is a real defect. A naive JSON.stringify comparison fails four runes for nothing; a normalise-keys-keep-arrays comparison fails only on substance.

This subsumes the RDFa/JSON-LD question. The shipped JSON-LD is harvested pre-engine and the shipped HTML is the post-engine tree, so "both harvests agree" is exactly "the RDFa in the published HTML expresses the same graph as the published JSON-LD" — the invariant this spec was otherwise going to assert by hand. With one caveat worth recording: collectJsonLd is an RDFa subset (no @about, @resource, @vocab, prefixes or @rel), so it proves our reader sees the same graph at both points, not that a conformant processor would. Upgrading to a real distiller over the rendered HTML is a later option, not a prerequisite.

It also makes relocation safe rather than brave. Every argument for moving extractSeo — the postProcess hole, and stamping the rendered node instead of a hidden <meta> (below) — becomes a change with a net under it instead of a leap. And the net is not passive: run at page level, through the real pipeline, the invariant fails today on a page using {% breadcrumb auto=true %}, because the post-engine harvest sees a BreadcrumbList the pre-engine one never had. That is the known bug surfacing itself, which is the behaviour wanted.

Hence a scope choice: rune-level (fixtures, cheap, catches engine drift) or page-level (through runPipeline, catches the postProcess class too). Both, ideally — they are the same assertion at two granularities.

The hidden carrier, and what relocation would buy

A value-only schema property is emitted twice, and neither copy is the one the reader sees. recipe's rendered output:

<article typeof="Recipe" … data-prep-time="PT15M">
  …
  <dl data-name="metadata">
    <div data-name="row" data-field="prepTime"><dt>Prep</dt><dd data-meta-type="temporal">15m</dd></div>
  …
  <meta content="PT15M" property="prepTime" />   <!-- trailing, after the content div -->
</article>

PT15M appears three times: the fields bag on the root, the rendered <dd>, and a hidden <meta>. The RDFa is correct — the meta is inside the Recipe scope, so the triples are right — but the node a human reads carries no schema, and the node carrying the schema is invisible.

The cause is the same seam as everything else here, inverted. The transform stamps a <meta> because at transform time the <dd> does not exist — the engine builds that <dl> later from data-rune-fields. Not "the engine cannot emit schema" but its mirror: the engine's own output cannot carry schema.

RDFa has the right idiom for a human/machine value split — @content overriding the element text:

<dd property="prepTime" content="PT15M" data-meta-type="temporal">15m</dd>

One node instead of two. But the engine builds that <dd>, so stamping it means stamping at engine time, which today's pre-engine harvest would never see — you would need the meta and the stamp, worse than now.

This was a second argument for relocating extractSeo past the engine. It is not enough — see the decision below. The hidden metas stay, and the table simply says which kind of carrier a row wants, defaulting to the hidden <meta>: today's behaviour, made explicit rather than incidental.

Decision: move the harvest after the pipeline, not after the engine

The two relocations differ by an order of magnitude, and the difference is structural rather than a matter of effort.

After the pipeline — in scope

Recompute seo from enrichedPages once runPipeline returns, inside loadSite. One change in one place: extractSeo is pure, the pages are in hand, and it stays where content loading already lives — framework-agnostic, before any adapter sees anything. It closes the postProcess hole completely.

After the engine — ruled out

There is no post-engine seam to move to. The engine is not invoked at one place in the framework; in SvelteKit it runs in the site's own load function:

// site/src/routes/[...slug]/+page.server.ts
const renderable = hl(transform(serialized));   // ← the engine, line 29
…
seo: page.seo,                                   // ← line 41

Three lines apart, in code the user owns. Eleventy differs again — it passes page.renderable straight to renderPage and reads page.seo off the load result, never calling createTransform itself.

So a post-engine harvest is not one relocation but N, several of them in user-land site code. The pre-engine harvest exists because it is the last framework-agnostic point — which is what this spec's earlier "content loading is framework-agnostic" line was gesturing at, and it is a structural fact rather than a preference.

What that forecloses is only the rendered-node carrier, and that is cosmetic: the RDFa is correct either way, both channels carry the right triples, and the cost is three hidden elements per rune. Not worth N adapter changes plus churn in every site's load function.

Detection survives the decision. The two-point invariant runs in tests, where engine output is available in a harness, so drift is caught without production harvesting moving at all.

Two sub-decisions inside the move

  • extractSeo returns og metadata as well as JSON-LD. Recomputing after the pipeline re-derives og from the enriched tree, and extractOgMeta reads hero / first h1 / first paragraph / first image — all of which postProcess can touch (collection and pagination sentinels inject content). Recompute both and let the baseline show what moves; recomputing only jsonLd would leave og deriving from a tree that no longer matches the page.
  • This is an output change, by design. Pages using {% breadcrumb auto=true %} gain a BreadcrumbList they do not publish today. That is the fix, but it should land as a visible diff against the baseline rather than as a silent side effect — another reason the baseline snapshot sequences first.

Before anything moves: the baseline

This migration rewrites structured data across 30 runes in 10 packages, and the output is a thing nobody looks at directly — a page renders identically whether its JSON-LD is right or ruined. Every regression in this spec's history was found by running extractSeo, not by reading a transform, and four dead CSS selectors survived years of review precisely because nothing asserted them.

So the first work item is a baseline snapshot of today's JSON-LD for every emitting rune, before a single call site changes. Per-rune fixtures through extractSeo, committed. Then each migration step is reviewed as a diff against it: playlist type="podcast" should change, recipe should not, and the seven Group A entities disappear in exactly one commit.

The existing coverage is not that. packages/runes/test/seo.test.ts and the per-plugin seo.test.ts files assert a handful of runes — accordion, breadcrumb, playlist — with hand-written expectations, and several of the runes this spec changes have no JSON-LD test at all. Cheap to build now while the current behaviour is the reference; impossible to reconstruct once the sweep has started.

Decisions

Everything below was an open question. None needs more research; each is recorded with the reasoning so it is not re-litigated.

D1 — schema="none" stays a value, not a second attribute

The vocabulary is "a schema.org type, or none", which is a union of two kinds of thing and reads fine anyway. The alternative — a separate suppression attribute — splits one concern across two spellings, which is worse. It has also shipped (WORK-552), so the cost of changing it is real and the benefit is cosmetic. Document the vocabulary; change nothing.

D2 — organization is the precedent, not the inconsistency

A correction to earlier revisions of this spec, which twice described organization's type= as free-text and unvalidated. It is neither:

const orgType = ['Organization', 'LocalBusiness', 'Corporation',
                 'EducationalOrganization', 'GovernmentOrganization', 'NonProfit'] as const;
type: { type: String, required: false, matches: orgType.slice(), … }

A curated six-value enum, enforced by Markdoc. So organization is already doing exactly what this spec proposes — deriving a schema.org type from a content attribute the author has already set — just expressed imperatively. It converts to a by: 'type' table directly, and its rows are the simplest possible kind: a type and nothing else, since all six share Organization's properties.

And its list contains a type that does not exist. schema.org has NGO; there is no NonProfit. The enum validates against itself, so matches is satisfied and nothing notices that the value is not in the vocabulary it claims to speak. Correcting it to NGO belongs with this conversion.

That finding is the argument for the whole spec in miniature: the mapping was already a curated table, it was already wrong, and it was wrong somewhere no tool could look. Making it data that inspect and contracts can print is what turns "someone would have to notice" into "someone can review it".

D3 — a universal schema="<Type>" override is deferred

With per-type tables everywhere and no free-text path (D2), the layering this spec described reduces to two live mechanisms: derive (a content attribute picks the row) and suppress (schema="none"). The third, override, has no demonstrated use once the default is derived — nobody has asked for it, and it is the only one that lets an author assert a type the rune has no mapping for.

Deferring it is also what makes D5 hold. Ship derive and suppress; add override if a real case appears.

D4 — an entity with no properties is not emitted

A row that resolves to a bare @type emits nothing. Seven runes change — gallery, data-table, budget, itinerary, map, symbol, blog — each of which currently publishes {"@context": …, "@type": "Dataset"} and no more. A type assertion with nothing attached tells a consumer nothing; it is noise in every channel that reads it.

This gives Group A a migration with a forcing function — write a mapping or lose the type — rather than a silent carry-forward of seven meaningless entities.

D5 — no validation mechanism; review is the control

Narrowing to a subtype is always safe; switching branches is not. With every multi-type rune carrying a curated table (D2) and no override (D3), a rune only ever emits a type it has a row for, so the unsafe case stops being expressible. No validation mechanism is needed.

But "no mechanism" is not "no risk", and D2 is the proof. Nothing checks a table against schema.org, because refrakt ships no ontology and this spec does not propose adding one. What replaces validation is visibility: inspect and contracts print the resolved table, so a wrong row is reviewable. That is a weaker guarantee than validation and should be described as such rather than implied away.

D6 — declared list properties always serialise as arrays

appendToProperty stores the first value as a scalar and only promotes on the second, so a one-track playlist emits "track": { … } and a two-track one emits "track": [ … ] — the shape of the output varying with the amount of content. A row may declare a property a list; those always emit an array.

Cheap while the shape is being designed, awkward to retrofit. It changes output for every single-item collection, so it lands as a visible diff against the baseline.

D7 — the table is part of the public plugin contract

It has to be: 67 of the runes live in plugins, and a plugin rune must declare its schema the way a core rune does. That extends "curation, not validation" (D5) to third parties, who would be asserting schema.org types on their users' pages with no ontology to check them against and no theme-level suppression (by ADR-028, and rightly).

Accepted. It is the same trust already extended to any plugin's transform code, which can emit arbitrary typeof today, and schema="none" gives the author an out. D2 shows the risk is not hypothetical even in first-party code — which is an argument for inspect --audit covering plugin runes, not for withholding the mechanism.

D8 — the postProcess hook calls the applier

buildAutoBreadcrumb builds its renderables outside any Markdoc schema, so the wrapper cannot reach it. It is one call site: the hook applies the resolved row directly. That keeps "not half of each" exceptionless rather than carving out the one emitter that happens to live in a pipeline phase.

The position divergence folds in here — breadcrumb emits <meta property="position" content="1">, a string in RDFa against a number in the JSON-LD. Emit String(index + 1) so both channels agree, rather than teaching the invariant to tolerate a mismatch.

D9 — no contextProperties; each emitter keys off its own attribute

The "two emitters, one mapping" section above called this a question the spec must answer. Answered here, against the built packages rather than by reading the transforms — and the premise it rested on is false.

The two emitters never populate the same collection. playlist builds its track items exclusively from markdown-list itemModel data (playlist.ts:121-155). Its content model has no field matching a track tag, so a {% track %} inside a {% playlist %} falls through to the greedy body field: it renders as a bare <li> in the prose body, outside the <ol data-name="tracks">, and its JSON-LD floats up as a detached top-level MusicRecording. Filed as BUG-016 — it is wrong today, and the docs recommend it.

So the feared mix — "a podcast's inline items become PodcastEpisode while {% track %} children stay MusicRecording" — cannot arise, because a {% track %} was never among the playlist's children in the first place.

Each emitter already declares its own type. track carries its own five-value enum — song | episode | chapter | talk | video (track.ts:15) — and emits MusicRecording for all five, exactly as playlist ignores its own type. The same defect, in a second rune, independently fixable. So both convert to by: 'type' over their own attribute:

Runeby:Rows
playlistits typealbum, mix, podcast, audiobook, series — plus the child mapping for its transform-built items
trackits typesong, episode, chapter, talk, video

Two tables, no threading, nothing to keep in step. The consistency the section worried about is a property of each rune honouring the attribute the author already set, not of a shared mapping.

And the general rule, which outlives this rune pair: the parent retypes its children; a child never declares its context. collectJsonLd nests a typed node into its parent only when that node carries both typeof and property (seo.ts:109), and only the parent can supply the property. So a parent that wants a child in its graph must already touch that child's attributes — at which point stamping typeof alongside property is free, and contextProperties would be a second mechanism for what children: does. Markdoc's bottom-up transform order says the same thing from the other side: at transform time a child cannot see its parent, while a parent sees its already-transformed children. contextModifiers works only because the engine runs later, over a whole tree.

That rule splits into two channels, which behave differently and should be stated separately:

  • property — which collection the child joins (track vs hasPart) — is always the parent's. It describes a relationship, and only the parent knows it. This is forced, not chosen: without the parent's stamp the child floats free whatever type it carries.
  • typeof — what the child is — is the child's when declared, else the parent's child-row default.

contextProperties therefore stays deferred, on the same grounds as D3's override: no demonstrated use.

BUG-016 is being resolved by making the composition work (WORK-572), and that does not disturb any of the above — it confirms it. A nested {% track %} with no explicit type takes the playlist's child type; one with an explicit type keeps it; the playlist supplies the collection property either way. The child still declares nothing about its parent. What it costs this spec is only that playlist's children: mapping must match tag-built children as well as transform-built ones — a wider matcher on the parent, not a new mechanism.

Migration shape

Seven work items. The first two are independent of the table and land first.

  1. Baseline snapshot — JSON-LD fixtures for all 30 emitting runes, committed before anything moves.
  2. Harvest after the pipeline — recompute seo from enrichedPages, plus the two-point drift invariant. Fixes breadcrumb auto on its own.
  3. CSS decoupling — the six Lumina rules off the schema.org channel (BUG-015), plus the coverage assertion that keeps them off.
  4. The mechanism — the table, the applier, entities / text / index, IDENTITY_FIELDS, and the ~10 unaddressable sources named first.
  5. Group A — apply D4; seven runes lose a bare type or gain a mapping.
  6. Group B — 14 runes, mechanical.
  7. Group C — nine runes, four separable shapes; playlist first since it exercises by:, children: and the inline stamps at once.

Tooling (contracts, reference, inspect) rides items 4–7 rather than forming its own, since each needs the table to exist before it has anything to print.

Non-goals

  • Page- and site-level schema. WebSite and Organization entities are built in seoToHtml and the Next/Nuxt head helpers, not from runes — and are absent from the Svelte(Kit) and html adapters entirely, so refrakt's own site publishes neither. That inconsistency is real but orthogonal; this spec is the rune-level channel only, and should say so rather than imply contracts will answer "what structured data does this page emit?" in full.
  • A schema.org ontology. See "Curation, not validation" above.

Acceptance Criteria

  • A baseline JSON-LD snapshot covers all 30 emitting runes and is committed before the first call site changes, so every later step is reviewed as a diff against it
  • seo is recomputed from enrichedPages after runPipeline, so postProcess-injected schema reaches the JSON-LD — {% breadcrumb auto=true %} publishes the BreadcrumbList it renders, asserted by a test
  • A rune's schema.org type and property mapping are expressible in config, keyed by a name in the rune's flat namespace (ADR-008) whether it surfaces as data-name or data-field
  • A schema value whose <meta> carrier is dropped as pure data is rebuilt from data-rune-fields, so recipe, event, track, playlist, character, realm, lore and howto keep the RDFa they emit today without createComponentRenderable gaining any knowledge of schema
  • Every schema source is addressable — the ~10 sources in neither properties nor refs (embed, tier, and the image nodes in figure, recipe, playlist, realm, faction) gain a name or a bag entry before their rune migrates
  • Plugin runes declare schema the same way core runes do, and the plugin-facing contract says so
  • The mapping is applied at transform time, so extractSeo still sees it — a test asserts the JSON-LD, not just the HTML attributes
  • A rune can offer more than one type, with per-type property names and per-type child mappings — where a child mapping carries its own property map, not just a type name
  • A child entity is never declared without the property that holds it, so it cannot float up as a detached top-level entity
  • Suppressing schema entirely is expressible on every rune, not just accordion, and strips the whole subtree rather than just the root
  • schema joins IDENTITY_FIELDS, so no merge path — theme override or variant delta — can redefine what a rune means
  • refrakt contracts describes the schema.org output it currently omits, and refrakt inspect shows a rune's resolved schema row rather than leaving it to be read out of the raw HTML
  • Every one of the 22 existing schema: maps is expressible, including the computed-meta cases
  • The imperative typeof: / property: stamps and the attributes.typeof = … mutations are covered too, or the runes carrying them are named as out of scope with a reason
  • A nested entity can name the property that takes its own content, with the applier emitting the RDFa-conformant wrapper — no rune hand-writes one
  • The JSON-LD is harvested at both the pre-engine and post-engine points and the two graphs are asserted equal — object keys normalised, array order significant — so RDFa/JSON-LD divergence fails a test rather than shipping
  • Grouping named sibling nodes into a nested entity is expressible, so testimonial's Person / Rating and event's Place are declared rather than synthesised by hand
  • A property declared a list always serialises as an array, so a one-item collection and a two-item one have the same shape (D6)
  • organization's six-value enum becomes a by: 'type' table, and NonProfit is corrected to NGO — a type that does not exist in schema.org (D2)
  • breadcrumb's position agrees between the RDFa and the JSON-LD (D8)
  • No stylesheet selects on property=; the six Lumina rules move to BEM element classes and a CSS coverage assertion keeps them there
  • defineRune({ schemaOrgType }) is deleted or fed from the table — the type is declared once
  • typeof="PageSection" is not emitted anywhere — it is not a schema.org type (the removal itself belongs to SPEC-133; this spec only requires that no invented type survives)
  • No entity is emitted without at least one property (D4) — each of the seven Group A runes either gains a mapping or stops emitting a type
  • The imperative form either still works or is fully migrated — not half of each, per rune

References

  • WORK-552 — schema="none" on accordion, shipping ahead of this
  • WORK-548 — the ~970 fabricated Question entries that surfaced it
  • SPEC-082 — the schema.org channel this reworks
  • ADR-028 — rune identity is not theme configuration; why the table belongs to the rune
  • BUG-013 — the mistyped playlists this would fix
  • BUG-015 — stylesheets selecting on the schema.org channel, four of them already dead
  • BUG-016 — a {% track %} inside a {% playlist %} is not one of its tracks; the finding behind D9
  • SPEC-133 — what data-field and data-name each mean; carries the contentSection removal this spec surfaced
  • ADR-008 — the flat namespace the table's keys live in